Laserfiche WebLink
Item of Payment <br />Payment for the work specified in this item shall be made under: <br />Bid Item No. 0162 1 2 - Prepared Soil Layer (4" Thick) - Per Square Yard <br />SECTION 285 - OPTIONAL BASE COURSE <br />A. Sub Article 285-4 is modified by the addition of the following: <br />Base material, thickness and requirements are described in the construction plans. <br />Only one type of alternate base material shall be used. No additional payment will <br />be made for base thickness in excess of the specified thickness <br />Item of Payment <br />Payment for the work specified in this item shall be made under: <br />Bid Item No. 0285 706 — Optional Base, Base Group 06 (8" Cemented Coquina <br />Shell Base, LBR 100, 2 Lifts) - Per Square Yard <br />SECTION 430 — PIPE CULVERTS <br />15" ADS HP Storm pipe shall be used for this project. <br />Item of Payment <br />Payment for the work specified in this item shall be made under: <br />Bid Item No. 0430 175 115 - Pipe Culvert Round, 15" S/CD (ADS HP) — Per Linear <br />Foot <br />Bid Item No. 0430 515 100 - Straight Concrete Endwalls, 15", Single, 0 Degrees, <br />Round — Per Cubic Yard <br />SECTION 522 — CONCRETE SIDEWALK AND DRIVEWAYS <br />The work specified in this item shall conform to Section 522 of the Florida <br />Department of Transportation Standard Specifications for Road and Bridge <br />Construction. <br />Item of Payment <br />Payment for the work specified in this item shall be made under: <br />01025-17 Technical Specifications <br />