My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-064
CBCC
>
Official Documents
>
2020's
>
2021
>
2021-064
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2021 2:13:26 PM
Creation date
4/27/2021 11:56:34 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
04/20/2021
Control Number
2021-064
Agenda Item Number
8.H.
Entity Name
Kimley-Horn and Associate, Inc
Subject
Agreement for Professional Engineering Services for the South Oslo Road Water Treatment Plant
Work Order Number 4
RFQ2019070
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCOPE OF WORK <br />Consultant will utilize the services and provide coordination of Control Systems <br />Design, Inc., and C&W Engineering for SCADA system integration and electrical <br />engineering in the execution of these tasks. <br />TASK 1 - DESIGN PHASE SERVICES <br />Consultant will prepare bid documents consisting of site plan depicting <br />improvements which are needed for present and future phasing, and panel <br />drawings and specifications for replacement and installation of new Remote I/O <br />and PLC panels. Drawings will consist of control panel details, subplate layout, <br />dead front layout, wiring diagrams, and specified PLC and 1/0 equipment. <br />The drawings will depict modifications to the Main PLC and the proposed High <br />Service Pump PLC. <br />Consultant will prepare design deliverables at 100% design interval. Design <br />deliverables will consist of plans, specifications with bid item list, and opinion of <br />probable construction costs (OPCC). <br />Consultant will perform one (1) site visit for data collection. <br />TASK 2 - BID PHASE <br />Consultant will provide coordination with IRCU purchasing department for <br />bidding the proposed improvements. <br />Consultant will attend one (1) pre-bid meeting and respond to reasonable <br />number of questions from potential bidders. <br />TASK 3 - CONSTRUCTION PHASE SERVICES <br />Consultant will attend one (1) pre -construction meeting with the Contractor, <br />Owner, Electrical Engineer, and Integrator. <br />Consultant will review shop drawings for conformance with the bid documents. <br />It is assumed that up to three (3) shop drawings will be reviewed. <br />Consultant will respond to a reasonable number of requests for information (up <br />to 4 assumed). <br />Consultant will review Contractor's monthly applications for payment. <br />KAWPB—Civ i[\General\Black\Florida\IRCU\Oslo - PLC Part A\20210325 - Scope - Oslo PLC Part A Scope.docx Page 2 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.