My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03/09/2021
CBCC
>
Meetings
>
2020's
>
2021
>
03/09/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2021 10:18:31 AM
Creation date
5/6/2021 10:12:23 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
03/09/2021
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
322
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task 4 - Survey Services (ISS Survey) <br />16. Provide topographic mapping and ortho photos of the project limits suitable for 1" = 20' <br />drawings including route survey, rights of way and easements <br />Task 5 — Utility Locates (Blood Hound) <br />17. Utility soft digs to locate pipe depths within the work area at the connection points and <br />identified crossings. <br />SERVICES AND/OR INFORMATION TO BE PROVIDED BY OTHERS <br />Client or others will provide the following services and/or information: <br />A. County to provide utility easement sketch and legal within work area. <br />B. County to provide utility locates for their facilities <br />C. County will provide the specification front end documents and general provisions. <br />D. County will authorize CEI and Certification under an addendum. Only design, permitting <br />and assisting with bidding will be provided by Consultants with this Work Order. <br />E. County will handle all aspects of public meetings, if any. <br />F. County will mark water and forcemain pipelines so they can be surveyed and potholed by <br />our team. <br />G. Provide record -drawings and information of existing . improvements and utility -owned <br />facilities and other substructures. <br />SPECIFIC EXCLUSIONS <br />Specifically not included in the above Scope of Services/Compensation are the following: <br />A., Any geotechnical services. <br />B. Any Environmental services <br />30 <br />
The URL can be used to link to this page
Your browser does not support the video tag.