My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03/09/2021
CBCC
>
Meetings
>
2020's
>
2021
>
03/09/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2021 10:18:31 AM
Creation date
5/6/2021 10:12:23 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
03/09/2021
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
322
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
February, 5 2021 <br />Mr. Eric. Flavell, PE, F -ASCE <br />Bowman Consulting Group <br />4450 W. Eau Gallie Blvd., Suite 232 <br />Melbourne, FL 32934 <br />*INFRASTRUCTURE <br />SOLUTION SERVICES <br />7175 Murrell Road, Nlelhout ne, F1, 329,M <br />Phone: 321-622.4646 <br />Subject: Proposal to Provide Surveying Services <br />Project No. BWM004—Sebastian 20" Forcemain Relocation <br />Dear Mr. Flavell: <br />Infrastructure Solution Services (ISS) is pleased to provide this proposal for surveying services for the <br />Sebastian .20" Forcemain Relocation Route Survey (the "Project") in Sebastian, .Florida, for Bowman <br />Consulting Group (BCG). <br />SECTION I. BACKGROUND <br />After speaking with Mr. Flavell (BCG and reviewing the provided scope and limits, it is ISS's <br />understanding that the:Project consists of a topographic route survey: of approximately 500' of FEC <br />(Florida East Coast) railroad Right Of Way (ROW) in Sebastian Florida. The Project includes the east <br />half of the ROW from the center of the tracks to 15' past the ROW line. The Project will start at 15' north <br />of the north ROW of Main Street and run south for 500'.. The area to be surveyed will also include a <br />section of Main Street starting at the center of the train tracks and running east 150' from ROW to <br />ROW. It is our understanding that the Project will include establishing all ROW lines and approximate <br />lot lines per plat and property appraiser information to be utilized for the purpose of designing the <br />relocations. All existing utility easements that are identified in the property appraisers research and or <br />provided by the client will also be established. <br />ISS will establish a minimum of three (3) site: benchmarks within the project area. The ISS project team <br />will locate all visible aboveground improvements, locate limits of dense vegetation, perform cross <br />sections .at intervals no greater than 50' to establish the project topography. Cross sections of lesser <br />intervals will be performed if the terrain dictates and all grade breaks will be collected. ISS will locate all <br />traffic pavement markings within the Project area. The location of any underground utilities that will be <br />marked by others will be located when all markings are complete. ISS will contact the. FEC prior to <br />commencement of work to coordinate access to their property. Mr. Flavell (BCG) has requested a high- <br />resolution georeferenced drone image to be used as a background in the survey. <br />
The URL can be used to link to this page
Your browser does not support the video tag.