My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03/09/2021
CBCC
>
Meetings
>
2020's
>
2021
>
03/09/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2021 10:18:31 AM
Creation date
5/6/2021 10:12:23 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
03/09/2021
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
322
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RION%ofats d:au(wfliffl; ('rrrarl; <br />'NIf 1a0 4t;f ld.1%, I' -ASI E. <br />€OIh ((jwr v 202 t <br />SECTION II. SCOPE OF SERVICES <br />TASK 1- Topographic Survey (As defined in Chapter SJ -17 Administrative Code) <br />A. Using the nearest published horizontal and vertical control, ISS will establish a minimum of three (3) <br />site control points with NAD, 1983 State Plane coordinate values and NAVD 88 vertical values for <br />the collection of data and to be used as site benchmarks. <br />B. Establish all of the of the ROW lines, easement lines and approximate lot lines within the project <br />area. <br />C. Map all above ground existing conditions utilizing conventional survey and GPS real-time kinematic <br />(RTK) methods along the route. Collect any marked underground utilities marked by others. <br />D. Fly a predefined route in accordance with all FAA part 107 regulations with a DJi Phantom 4 Pro <br />drone to obtain aerial images. Aerial images will be processed via Pix4D photogrammetry software <br />for image only. <br />SECTION III. SUBCONSULTANTS <br />N/A <br />SECTION IV. CLIENT'S RESPONSIBILITY <br />BCG will be responsible for providing the ISS project team the following items: <br />A. Any available easement information available. <br />B. Identification and marking of underground utilities. <br />SECTION V. DELIVERABLES <br />ISS will provide the following deliverables: <br />Task 1 - Existing Conditions Map <br />Three (3) copies of signed and sealed survey maps and one (1) digital copy delivered on CD or USB <br />drive. <br />SECTION VI. SCHEDULE <br />ISS will begin survey field work within two (2) weeks of receiving the signed proposal from BCG. Field <br />work and drafting will be complete within two (2) weeks of Project commencement. Survey map <br />deliverables will be provided to BCG within five (5) days thereafter. <br />
The URL can be used to link to this page
Your browser does not support the video tag.