My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-052B
CBCC
>
Official Documents
>
2020's
>
2021
>
2021-052B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2021 12:38:34 PM
Creation date
5/6/2021 12:26:36 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
04/06/2021
Control Number
2021-052B
Agenda Item Number
12.G.2.
Entity Name
Halley Engineering Contractors, Inc.
Subject
Award of Bid No. 2021018 for Construction of 66th Ave Roadway Widening
Area
(49th St. to 69th Street),
Project Number
IRC-1505
Bid Number
2021018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
371
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
decrease in cost plus a deduction in <br />CONTRACTOR's fee by an amount equal to <br />five percent of such net decrease; and <br />f. when both additions and credits are <br />involved in any one change, the adjustment <br />in CONTRACTOR's fee shall be computed <br />on the basis of the net change in accordance <br />with paragraphs 12.01.C.2.a through <br />12.01.C.2.e, inclusive. <br />12.02 Change of Contract Times <br />A. The Contract Times (or Milestones) may only <br />be changed by a Change Order or by a Written Amend- <br />ment. Any Claim for an adjustment in the Contract <br />Times (or Milestones) shall be based on written notice <br />submitted by the party making the claim to the ENGI- <br />NEER and the other party to the Contract in <br />accordance with the provisions of paragraph 10.05. <br />B. Any adjustment of the Contract Times (or <br />Milestones) covered by a Change Order or of any <br />Claim for an adjustment in the Contract Times (or <br />Milestones) will be determined in accordance with the <br />provisions of this Article 12. <br />12.03 Delays Beyond CONTRACTOR's Control <br />A. Where CONTRACTOR is prevented from <br />completing any part of the Work within the Contract <br />Times (or Milestones) due to delay beyond the control <br />of CONTRACTOR, the Contract Times (or Milestones) <br />will be extended in an amount equal to the time lost <br />due to such delay if a Claim is made therefor as <br />provided in paragraph 12.02.A. Delays beyond the <br />control of CONTRACTOR shall include, but not be <br />limited to, acts or neglect by OWNER, acts or neglect <br />of utility owners or other contractors performing other <br />work as contemplated by Article 7, fires, floods, <br />epidemics, abnormal weather conditions, or acts of <br />God. <br />12.04 Delays Within CONTRACTOR's Control <br />A. The Contract Times (or Milestones) will not be <br />extended due to delays within the control of <br />CONTRACTOR. Delays attributable to and within the <br />control of a Subcontractor or Supplier shall be deemed <br />to be delays within the control of CONTRACTOR. <br />12.05 Delays Beyond OWNER's and <br />CONTRACTOR's Control <br />A. Where CONTRACTOR is prevented from <br />completing any part of the Work within the Contract <br />Times (or Milestones) due to delay beyond the control <br />of both OWNER and CONTRACTOR, an extension of <br />the Contract Times (or Milestones) in an amount equal <br />to the time lost due to such delay shall be <br />CONTRACTOR's sole and exclusive remedy for such <br />delay. <br />12.06 Delay Damages <br />A. In no event shall OWNER or ENGINEER be <br />liable to CONTRACTOR, any Subcontractor, any <br />Supplier, or any other person or organization, or to any <br />surety for or employee or agent of any of them, for <br />damages arising out of or resulting from: <br />1. delays caused by or within the control <br />of CONTRACTOR; or <br />2. delays beyond the control of both <br />OWNER and CONTRACTOR including but not <br />limited to fires, floods, epidemics, abnormal <br />weather conditions, acts of God, or acts or <br />neglect by utility owners or other contractors <br />performing other work as contemplated by <br />Article 7. <br />B. Nothing in this paragraph 12.06 bars a change <br />in Contract Price pursuant to this Article 12 to <br />compensate CONTRACTOR due to delay, <br />interference, or disruption directly attributable to <br />actions or inactions of OWNER or anyone for whom <br />OWNER is responsible. <br />ARTICLE 13 - TESTS AND INSPECTIONS; <br />CORRECTION, REMOVAL OR ACCEPTANCE OF <br />DEFECTIVE WORK <br />13.01 Notice of Defects <br />A. Prompt notice of all defective Work of which <br />OWNER or ENGINEER has actual knowledge will be <br />given to CONTRACTOR. All defective Work may be <br />rejected, corrected, or accepted as provided in this <br />Article 13. <br />13.02 Access to Work <br />A. OWNER, ENGINEER, ENGINEER's Con- <br />sultants, other representatives and personnel of OWN- <br />ER, independent testing laboratories, and govern- <br />mental agencies with jurisdictional interests will have <br />access to the Site and the Work at reasonable times <br />for their observation, inspecting, and testing. <br />CONTRACTOR shall provide them proper and safe <br />conditions for such access and advise them of <br />CONTRACTOR's Site safety procedures and <br />programs so that they may comply therewith as <br />applicable. <br />General Conditions - 00700 - 29 <br />FAPublic Works\ENGINEERING DIVISION PROJECTS\1505-66th Ave Widening 49th St to 69th St\t-Admin\Bid Documents\Master Contract Documents\DIV 0-4—Conditions of the <br />Contract.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.