My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-052B
CBCC
>
Official Documents
>
2020's
>
2021
>
2021-052B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2021 12:38:34 PM
Creation date
5/6/2021 12:26:36 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
04/06/2021
Control Number
2021-052B
Agenda Item Number
12.G.2.
Entity Name
Halley Engineering Contractors, Inc.
Subject
Award of Bid No. 2021018 for Construction of 66th Ave Roadway Widening
Area
(49th St. to 69th Street),
Project Number
IRC-1505
Bid Number
2021018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
371
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IRC -1505 <br />The following individuals or entities shall be listed as "additional insureds" on the <br />CONTRACTOR's property insurance policies: <br />a. Indian River County, Florida <br />b. Indian River Farms Water Control District 0RFWCD) <br />SC -5.07 Waiver of Rights <br />SC -5.07 Delete GC -5.07 (paragraphs A, 8, and C) in its entirety. <br />SC -5.08 Receipt and Application of Insurance Proceeds <br />SC -5.08 Delete GC -5.08 (paragraphs A and 8) in its entirety. <br />SC -5.09 Acceptance of Bonds and Insurance; Option to Replace <br />SC -5.09 Delete GC-5.09(paragraph A)in its entirety. <br />SC -6.02 Labor; Working Hours <br />SC -6.02.6. Add the following paragraphs immediately after paragraph GC -6.02.8: <br />1. Regular working hours are defined as Monday through Friday, excluding Indian River <br />County Holidays, from 7 a.m. to 5 p.m. <br />2. Indian River County Holidays are: New Year's Day, Martin Luther King, Jr. Day, Good <br />Friday, Memorial Day, Independence Day, Labor Day, Veterans Day, Thanksgiving Day, <br />Friday after Thanksgiving, Christmas Eve and Christmas Day. Working on these days will <br />not be permitted without prior written permission and approval from the Construction <br />Coordination Manager. <br />3. The CONTRACTOR shall receive no additional compensation for overtime work, i.e., work <br />in excess of eight hours in any one calendar day or 40 hours in any one calendar week, <br />even though such overtime work may be required under emergency conditions and may <br />be ordered by the ENGINEER in writing. <br />4. All costs of inspection and testing performed during overtime work by the CONTRACTOR, <br />which is allowed solely for the convenience of the CONTRACTOR, shall be borne by the <br />CONTRACTOR, and a credit given to the OWNER to deduct the costs of all such inspection <br />and testing from any payments otherwise due the CONTRACTOR. <br />5. All costs of OWNER's employees and costs of ENGINEER's Consultant resulting from <br />overtime work by the CONTRACTOR, which is allowed solely for the convenience of the <br />CONTRACTOR, shall be borne by the CONTRACTOR, and a credit given to OWNER to <br />deduct all such costs from any payments otherwise due the CONTRACTOR. <br />6. No work shall commence before 7 a.m. or continue after 5 p.m. except in case of <br />emergency upon specific permission of the ENGINEER. <br />Supplementary Conditions - 00800-7 <br />FAPublic Works\ENGINEERING DIVISION PROJECTS\1505-66th Ave Widening_49th St to 69th St\1-Admin\Bid Documents\Master Contract Documents\DIV 0_5_Conditions <br />of the Contract.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.