My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-052B
CBCC
>
Official Documents
>
2020's
>
2021
>
2021-052B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2021 12:38:34 PM
Creation date
5/6/2021 12:26:36 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
04/06/2021
Control Number
2021-052B
Agenda Item Number
12.G.2.
Entity Name
Halley Engineering Contractors, Inc.
Subject
Award of Bid No. 2021018 for Construction of 66th Ave Roadway Widening
Area
(49th St. to 69th Street),
Project Number
IRC-1505
Bid Number
2021018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
371
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IRC -1505 <br />SC -6.06 Concerning Subcontractors, Suppliers, and Others <br />SC -6.06.C. Add the following sentence at the end of paragraph GC-6.06.C.- <br />OWNER <br />C-6.06.C. <br />OWNER or ENGINEER may furnish to any such Subcontractor, Supplier, or other individual or entity, to <br />the extent practicable, information about amounts paid to CONTRACTOR on account of Work performed <br />for CONTRACTOR by a particular Subcontractor, Supplier, or other individual or entity. <br />SC -6.08 Permits <br />SC -6.08 Add the following paragraphs immediately after paragraph GC -6.08.A: <br />The OWNER has obtained the following permits (copies of these permits are contained in <br />Appendix A): <br />A. St. Johns River Water Management District - Permit No. 87006-13, dated <br />11/17/2020 <br />B. St. Johns River Water Management District - Permit No. 69244-6, dated <br />12/15/2020 <br />C. Indian River Farms Water Control District - Permit No. 18-03, dated 08/01/2017 <br />D. Department of the Army - Permit No. SAJ-2017-01526 (NW -JCL), dated <br />07/17/2017 <br />2. The CONTRACTOR shall obtain and pay for all other required permits and <br />licenses. The CONTRACTOR shall provide copies of the permits to the <br />OWNER and ENGINEER and shall comply with all conditions contained in <br />the permits at no extra cost to the OWNER. <br />3. The CONTRACTOR shall be familiar with all permit requirements during <br />construction and shall be responsible for complying with these <br />requirements. The cost of this effort shall be included in the pay item in <br />which the work is most closely associated with. <br />SC -9.05 Authorized Variations in Work <br />SC -9.05.A. Delete the second sentence in paragraph GC -9.05.A in its entirety. <br />SC -11.01 Cost of the Work <br />SC -11.01.A.1. Delete paragraph GC -11.01.A.1 in its entirety, and insert the following sentences in its place: <br />1. CONTRACTOR will receive payment for actual costs of direct labor and burden (see SC - <br />2.06.6) for the additional or unforeseen work. Labor includes foremen actually engaged in <br />the work; and will not include project supervisory personnel nor necessary on-site clerical <br />staff, except when the additional or unforeseen work is a controlling work item and the <br />performance of such controlling work item actually extends completion of the project due <br />to no fault of the Contractor. Compensation for project supervisory personnel, but in no <br />case higher than a Project Manager's position, shall only be for the pro -rata time such <br />supervisory personnel spent on the contract. In no case shall an officer or director of the <br />Company, nor those persons who own more than 1% of the Company, be considered as <br />project supervisory personnel, direct labor or foremen hereunder. The expenses of <br />performing Work outside of regular working hours, on Saturday, Sunday, or legal holidays, <br />shall be included in the above to the extent authorized by OWNER. <br />Supplementary Conditions - 00800-8 <br />FAPublic Works\ENGINEERING DIVISION PROJECTS\1505-66th Ave Widening_49th St to 69th St\1-Admin\Bid Documents\Master Contract Documents\DIV 0 5 Conditions <br />of the Contract.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.