My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-052B
CBCC
>
Official Documents
>
2020's
>
2021
>
2021-052B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2021 12:38:34 PM
Creation date
5/6/2021 12:26:36 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
04/06/2021
Control Number
2021-052B
Agenda Item Number
12.G.2.
Entity Name
Halley Engineering Contractors, Inc.
Subject
Award of Bid No. 2021018 for Construction of 66th Ave Roadway Widening
Area
(49th St. to 69th Street),
Project Number
IRC-1505
Bid Number
2021018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
371
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IRC -1505 <br />SC -13.03 Test and Inspections <br />SC -13.03.13. Delete paragraph GC -13.03.8 in its entirety, and insert the following sentences in its place: <br />OWNER shall employ and pay for the services of an independent testing laboratory to perform all <br />initial inspections, tests, or approvals required by the Contract Documents except those <br />inspections, tests, or approvals listed immediately below. Subsequent inspections, tests, or <br />approvals required after initial failing inspections, tests, or approvals shall be paid for by the <br />CONTRACTOR by back charge to subsequent applications for payment. The CONTRACTOR shall <br />arrange, obtain, and pay for the following inspections, tests, or approvals: <br />1. inspections, tests, or approvals covered by paragraphs 13.03.0 and 13.03.1) below; <br />2. costs incurred in connection with tests or inspections conducted pursuant to paragraph <br />13.04.13 shall be paid as provided in said paragraph 13.04.13; <br />3. tests otherwise specifically provided in the Contract Documents. <br />SC -13.05 OWNER May Stop the Work <br />SC -13.05.A. Delete paragraph GC -13.05.A in its entirety and insert the following paragraph in its place: <br />A. If the Work is defective, or CONTRACTOR fails to supply sufficient skilled workers or <br />suitable materials or equipment, or fails to comply with permit requirements, or fails to <br />comply with the technical specifications, or fails to perform the Work in such a way that <br />the completed Work will conform to the Contract Documents, OWNER may order CON- <br />TRACTOR to stop the Work, or any portion thereof, until the cause for such order has been <br />eliminated; however, this right of OWNER to stop the Work shall not give rise to any duty <br />on the part of OWNER to exercise this right for the benefit of CONTRACTOR, any <br />Subcontractor, any Supplier, any other individual or entity, or any surety for, or employee <br />or agent of any of them. <br />SC -13.07 Correction Period <br />SC -13.07A. Delete the firstsentence of paragraph GC -13.07.A in its entirety and insert the following sentence <br />in its place <br />A. If within one year after the date of Final Completion or such longer period of time as may <br />be prescribed by Laws or Regulations or by the terms of any applicable special guarantee <br />required by the Contract Documents or by any specific provision of the Contract <br />Documents, any Work is found to be defective, or if the repair of any damages to the land <br />or areas made available for CONTRACTOR's use by OWNER or permitted by Laws and <br />Regulations as contemplated in paragraph 6.11.A is found to be defective, CONTRACTOR <br />shall promptly, without cost to OWNER and in accordance with OWNER's written <br />instructions: (i) repair such defective land or areas, or (ii) correct such defective Work or, if <br />the defective Work has been rejected by OWNER, remove it from the Project and replace it <br />with Work that is not defective, and (iii) satisfactorily correct or repair or remove and <br />replace any damage to other Work, to the work of others or other land or areas resulting <br />therefrom. <br />SC -13.07 B. Delete paragraph GC -13.07.8 in its entirety and insert the following sentence in its place <br />Supplementary Conditions - 00800-9 <br />FAPublic Works\ENGINEERING DIVISION PROJECTS\1505-66th Ave Widening_49th St to 69th St\1-Adm1n\Bid DocumentsWaster Contract Documents\DIV 0_5_Conditions <br />of the Contract.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.