Laserfiche WebLink
Division 1— General Requirements, IRC -1505 <br />SECTION 01024 - FORCE ACCOUNT. <br />1 1 (;FNFRAI <br />A. CONTRACTOR shall furnish all labor, materials, equipment and incidentals necessary to <br />perform additional work not covered on the Contract Drawings. The force Account is <br />intended as a contingency for unforeseen work. <br />1.2 PAYMENT <br />A. Lump sum amount for force account work is included in the bid schedule. The value of force <br />account work will be determined in accordance with Article 12 of the General Conditions. <br />++ END OF SECTION ++ <br />Force Account - 011024-1 <br />FAPubI1c Works\ENGINEERING DIVISION PROJECTS\1505-66th Ave Widening_49th St to 69th SM-Admin\Bid Documents\Master Contract Documents\DIV 1 GENERAL <br />REQUIREMENTS.docx <br />