My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-052B
CBCC
>
Official Documents
>
2020's
>
2021
>
2021-052B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2021 12:38:34 PM
Creation date
5/6/2021 12:26:36 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
04/06/2021
Control Number
2021-052B
Agenda Item Number
12.G.2.
Entity Name
Halley Engineering Contractors, Inc.
Subject
Award of Bid No. 2021018 for Construction of 66th Ave Roadway Widening
Area
(49th St. to 69th Street),
Project Number
IRC-1505
Bid Number
2021018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
371
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Division 1—General Requirements, IRC -1505 <br />SECTION 01050 - FIELD ENGINEERING AND LAYOUT <br />1.1 GENERAL <br />A. The CONTRACTOR will furnish all construction staking for the project. All staking from <br />control will be under the supervision of a Florida Registered Land Surveyor. <br />B. Develop and make all detail surveys and measurements needed for construction including <br />but .not limited to, slope stakes, batter boards, piling layouts and all other working lines, <br />elevations and cut sheets. <br />C. Keep a transit and leveling instrument on the site at all times and a skilled instrument man <br />available whenever necessary for layout of the Work. <br />D. Provide all material required for benchmarks, control points, batter boards, grade stakes, <br />and other items. <br />E. Be solely responsible for all locations, dimensions and levels. No data other than written <br />orders of the ENGINEER shall justify departure from the dimensions and levels required by <br />the Drawings. <br />F. Safeguard all points, stakes, grademarks, monuments and benchmarks made or established <br />on the Work, and reestablish same, if disturbed. Rectify all Work improperly installed <br />because of not maintaining, not protecting or removing without authorization such <br />established points, stakes, marks and monuments. <br />G. When requested by the ENGINEER, provide such facilities and assistance as may be <br />necessary for the ENGINEER to check line and grade points placed by the CONTRACTOR. Do <br />no excavation or embankment work until all cross -sectioning necessary for determining pay <br />quantities has been completed and checked by the ENGINEER. <br />H. The cost of performing engineering and layout work described above shall be included in <br />the contract unit prices for the various items of work to which it is incidental. No separate <br />payment will be made for surveying or engineering. <br />1.2 SURVEY WORK AND QUALIFICATIONS OF SURVEYOR <br />A. Prior to commencing work, the CONTRACTOR shall satisfy himself as to the accuracy of all <br />survey and existing site information as indicated in the Contract Documents. Immediately <br />notify the ENGINEER upon discovery of any errors, inaccuracies or omissions in the survey <br />data. The commencing of any of the work by the CONTRACTOR shall be held as the <br />CONTRACTOR's acceptance that all survey or existing site information is correct and <br />accurate, without any reasonably inferable errors, inaccuracies or omissions. <br />Field Engineering and Layout - 01050-1 <br />FAPublic Works\ENGINEERING DIVISION PROJECTS\1505-66th Ave Widening_49th St to 69th St\1-Admin\13id Documents\Master Contract Documents\DIV 1_GENERAL <br />REQUIREMENTS.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.