My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-052B
CBCC
>
Official Documents
>
2020's
>
2021
>
2021-052B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2021 12:38:34 PM
Creation date
5/6/2021 12:26:36 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
04/06/2021
Control Number
2021-052B
Agenda Item Number
12.G.2.
Entity Name
Halley Engineering Contractors, Inc.
Subject
Award of Bid No. 2021018 for Construction of 66th Ave Roadway Widening
Area
(49th St. to 69th Street),
Project Number
IRC-1505
Bid Number
2021018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
371
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Indian River County Purchasing Division <br />purchasing@ircgov.com <br />ADDENDUM NO. 2 <br />Issue Date: January 12, 2021 <br />Project Name: 66th Ave Widening (49th St to 69th St) — IRC -1505 <br />Bid Number: 2021018 <br />Bid Opening Date: February 3, 2021 <br />1 <br />This addendum is being released to change the pre-bid meeting location. The information and documents <br />contained in this addendum are hereby incorporated in the invitation to bid. This addendum must be <br />acknowledged where indicated on the bid form, or the bid may be declared non-responsive. <br />The location of the pre-bid meeting to be held at 10:00 a.m. on January 13, 2021 has been moved to 1800 <br />27th Street (Building B), room Bl -501 (large conference room). i <br />Bidders may still attend via zoom by clicking: https:Hircgov.zoom.us/i/7837260776 <br />Call 772-226-1416 if you need assistance logging in. Note the meeting will not be initiated until <br />approximately 10 minutes prior, and all attendees will be placed in the waiting room until entry is <br />granted. Attendees will be individually added, after their contact information has been provided and <br />entered by County staff into the sign -in sheet. <br />No attendee will be allowed to sign in after the meeting has begun. <br />
The URL can be used to link to this page
Your browser does not support the video tag.