My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-067
CBCC
>
Official Documents
>
2020's
>
2021
>
2021-067
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2021 11:21:27 AM
Creation date
5/6/2021 1:35:59 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
05/06/2021
Control Number
2021-067
Agenda Item Number
Signed by County Administrator
Entity Name
Edlund, Dritenbas, Binkely Architects & Associates, Inc.
Subject
Jackie Robinson Training Complex Ticket Office Building Remodel Phase II
Work Order No. 4
Bid Number
IRC-2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXIMIT <br />J, Ventilate the attic space: and add R-38 insulation,in home linker room and offices. <br />k, tmestivate all exhaust fans for size and performanceand replace as needed, <br />I. Remote the ceiling in area one and revise lighting. <br />nt. Pro\ ide return air plenum ill ceiling space in Area 2 V isitOr's locker roam. <br />it. Ventilate attic space w ith new exhaust ventilation in Area 3. l Ionic locker rooni. <br />o. Reseal if door,, and cs indoi�,. <br />p. ReplaccXcpai"r ati� datttaged \c iodo%%sills. <br />q. Repair stucco cracks in soffit, <br />r. Address roof ponding in southwest comer of roof. <br />s. Seal cracks in COIL=. <br />t. Seal cracks in slab. <br />?. A code tee ict� for life safet-, and building codes will be lt,nc to dennnine if any modificationa <br />are necessar\ to he code compliant. <br />3. \leetinO w ith building officials to determine w hat must be brought up to code. <br />4. Indicate areas of code cotiipliance modifications and methods olcorrections as needed. <br />i. The Architect i\ ill assist flu:Owner in addressing building department ro iew comments. The <br />Archiwct will appt\ tier all building department permits and proN ide required documentation. <br />Owner will pa\ all required building -permit fees. <br />6. Our se r\ ices «tll include the cost., of mechanical, electrical. plumbing: and structural consultant-, <br />used ti! doelop the -construction documents. W \t ill assist 'in bidding administratiba. ansN\erina <br />bid questions as needed. <br />9.The Architect will pro%ide limited. construction administration %Oieh, %could include periodic <br />construction observation at a-mininttun of tk� ice a month during consiruciic?n; shop drawing <br />revietk and requests for infortnation (.RI=I'a). <br />B. Deliverables <br />The Architect %vill provide the foflowing docwtients: <br />l) sets ol' si�_ncd and sea] ed.eonstruction documents: <br />�} meet_irlos with Ui.sner as needed. <br />_j) Meetngs «ith pemtittins� aOcncies havint ��urisdiction over the project as needed. Note: <br />'File proposed plans must receive Indian River C'ourtl huilaim,o pentiit. Any site.utilitY <br />design will tic by Owner. <br />l) AlltOCAD Iilvs to be delivered to C)wner at 100`? submittal. <br />We anticipate the following schedule: <br />Task Duration <br />I. Field work, establish base sheet 3 weeks <br />if. Complete construction documents 6weeks <br />III. Bidding, building permit review 8 weeks <br />IV. Construction 3 months <br />
The URL can be used to link to this page
Your browser does not support the video tag.