My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-067
CBCC
>
Official Documents
>
2020's
>
2021
>
2021-067
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2021 11:21:27 AM
Creation date
5/6/2021 1:35:59 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
05/06/2021
Control Number
2021-067
Agenda Item Number
Signed by County Administrator
Entity Name
Edlund, Dritenbas, Binkely Architects & Associates, Inc.
Subject
Jackie Robinson Training Complex Ticket Office Building Remodel Phase II
Work Order No. 4
Bid Number
IRC-2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
m t. <br />a <br />C. Owner's )i esnonsibilih <br />7 -he �Respotis'tbilities shall be as follows: <br />1. Provide an existing drawings':aur+e� +• <br />?. Ciyil engineer consultant tees it'needed; <br />All permit and application fe s. <br />4. :asbestus abatetnc hl.,sur+ ey i f needed, <br />5. All A'C' unit replacements andtur duct ntoditicali0n4: <br />6. Termite consultaot treatments if deemed necessar\ <br />7. An\ mof.repair:'repljee.j,,ent itnVeded. <br />8. Windo++ and doer replacement oil emerior is liti O her. <br />D. Additional Services <br />1. Interior design services. <br />?_ Costs to niodif\ completed dra%%in��s, prc+int:tSI\ apl)tcned b� ()wtter; for revisions <br />due to scope changes or value engineering, <br />'Da imatedrendering t or additional renderings, <br />4. Specialized foundation.. <br />;. Consultation concerning re.placctnet is of am- work damage 1 b\ sire orother cause <br />during construction. <br />6. Makin`e re0sions in drawings. specifications or other doCt►11101ta +vhett such isions <br />are inconsistent %+ith instruction pNviousb given by the (h ner or any agent <br />authorized by the Owner. <br />7. Preparing as built dra%%ings showingsignificant changes in \+4xrk durinc construction <br />or uninediatelr utter building coin0letion. <br />S [Providing detailed pre imill- . cast data prior . construction docuntants. <br />1). Specialized engineering studies and design (i.e. ++.ater and sewer connectionsoutside. <br />Of the building,'footprit t +shich would involve ser ices of'a Civil Engineer), <br />10. Securit4' and surveillance systems design. bitled at cost phis 1 P'o <br />H. Special cnnsultatlt, outside the normal mechanical..clectrical. plumbing. structural <br />services. billed'at cost }flus 1>°6, <br />In the event -additional building sglutions: expanded scope, or additional research .be requested by <br />the O ner. tI)B Architects will pro\ ide them for additional cast at the 161lot+ing hourly, rates: <br />Principals: John Hinkle\ <br />Registered Prnjeet :Architects <br />Intern architects <br />'feel nicuf level one Senior C:1DD Designer <br />Technical level tw.o -- CADD Designer <br />Technical level three - CADD `I"rchnic'tan <br />Clerical and acc:uunting <br />btrviccs,of f.nginrering Consultants tit'°nceded-1 -- cast <br />S 165.00 per hour <br />$1'5.()0 per hour <br />51,05.0 per hour <br />S 8>.00 per hour. <br />1 7-5.00 per.hour <br />S 65.00 per hour <br />S 50.00 per hour <br />plus 159 <br />
The URL can be used to link to this page
Your browser does not support the video tag.