Laserfiche WebLink
1101W." 14'e,!st <br />futuire, to track changes in structure, increase in size or occurrence in defects, and <br />identify areas requiring mitigation. Consultant will use survey of !Structure to <br />identify location,of defects observed, <br />As part. of evaluation, calculations will be performed to check the original design <br />capacity usiingavaiiable information providedtoConsultant bythe County and the <br />tank manufacturer in addition to the results of the survey, These c4lculations Will <br />be used to formulatiethe technical memorandom outlined in Task 04 to determine <br />if the structure still has remaining useful life or if it is no longer safe for operation. <br />A brief surnmary of fiOcl notes and initial findings will be submitted to the client <br />at conclusion of Task 03., <br />Task 04 Technical Memorandum and Workshop <br />The Consultant shall prepare a prelirrwinary technical memorandum (TM) <br />summarizing evaluations of'the data collected and results of structural testing. <br />The TM will include up to three (3) options for mitigating or upgradingthe existing <br />oxidation ditches and bridge structures, a comparison of the benefits and <br />challenges of implementing each option, and a rough, order of magnitude <br />engMeer's estimated cost for each option. <br />nos preliminary TIVI will be provided electronically one week prior to being <br />presented in a Workshop formatfor IRC Staff, The Workshop wfll culminate in <br />discussions with attendees that will result in a final recommendationfor structural <br />improvements at the West WWTP oxidation ditches. A summary of the Workshop <br />discussions will be created and distributed to attendees within three (3) days of <br />the Presentation, <br />b. Final Evaluationaind Recornimendation'TIVI <br />Following the' Workshop, the TIVI will be updated to include review comments and <br />to include the final recorn mend ation(s). One (1) electronic copy and four (4) draft <br />and copies will be provided to IRC Staff. <br />Deliver-ables <br />Task Defiverable <br />3 Preliminary Field Notes and Findings <br />. . . . . . . ................... <br />4 Draft Structural Evaluation'TM <br />4 Final Structural Evahmtion TM <br />&,'hedule <br />The anticipated schedule shown below is based on the weeks after the forinal issuance of the <br />notice to proceed by the County: <br />I <br />