Laserfiche WebLink
J'R(, I W6,4 t#nPnwenu,,,ntS phase I <br />Task <br />Project Kick --Off Meeting <br />Begin Survey Activities <br />Data Collection and Review <br />Structural Inspection and Evaluation <br />Draft Structural Evaluation TIVI <br />Workshop <br />Final,StrUdUral Evaluation I'M <br />.... .. .... . ... .. .. . <br />Duration from NTP <br />2 weeks <br />4 weeks <br />4 weeks <br />4 weeks <br />12 weeks <br />14 weeks <br />16 weeks <br />Qualily Coritirol <br />Consultant will be responsible -for the professional quality of all deliverables. This shall include <br />an internal Quality Assurance Plan that, as a minimum, provides review of all deliverables and <br />sig AoWk­ V4T_rt' -,s3k_t wt-, 3-n-o-tt-, r &rr.- ;4.? y, ,eWi ig <br />-r or calculation. <br />Asstimptions <br />The following assumptions have been made in the development of this scope of work, <br />schedule, and fee: <br />General <br />The Record Drawings, calculations, and information on any upgrades for both oxidatior, <br />ditches are <br />• Data requests will be addressed within five (5) calendar days. <br />• Workshop will be held at a location that meets Covid-19 social distancing requirements. <br />0 Facilities or areas to be surveyed are readily accessible. <br />The 3D model could have some obscured areas especially from the inside's scans due of <br />obstructions and led area to set up the scanner at the crossing bridges on top of the <br />tank. <br />ExidUSiODS <br />The following items are excluded from this scope of work: <br />• Design or permit docurnents, <br />• Destructive inspection. <br />• Material testing or sampling,. <br />• Inspections of enclosed areas, <br />0 <br />