My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-077
CBCC
>
Official Documents
>
2020's
>
2021
>
2021-077
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2021 10:38:17 AM
Creation date
5/27/2021 1:22:55 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
05/18/2021
Control Number
2021-077
Agenda Item Number
8.G.
Entity Name
Atkins
Subject
Work Order #4, West Regional Wastewater Treatment Plant Oxidation Ditch
and Bridge Structural Improvements, Phase 1
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
J'R(, I W6,4 t#nPnwenu,,,ntS phase I <br />Task <br />Project Kick --Off Meeting <br />Begin Survey Activities <br />Data Collection and Review <br />Structural Inspection and Evaluation <br />Draft Structural Evaluation TIVI <br />Workshop <br />Final,StrUdUral Evaluation I'M <br />.... .. .... . ... .. .. . <br />Duration from NTP <br />2 weeks <br />4 weeks <br />4 weeks <br />4 weeks <br />12 weeks <br />14 weeks <br />16 weeks <br />Qualily Coritirol <br />Consultant will be responsible -for the professional quality of all deliverables. This shall include <br />an internal Quality Assurance Plan that, as a minimum, provides review of all deliverables and <br />sig AoWk V4T_rt' -,s3k_t wt-, 3-n-o-tt-, r &rr.- ;4.? y, ,eWi ig <br />-r or calculation. <br />Asstimptions <br />The following assumptions have been made in the development of this scope of work, <br />schedule, and fee: <br />General <br />The Record Drawings, calculations, and information on any upgrades for both oxidatior, <br />ditches are <br />• Data requests will be addressed within five (5) calendar days. <br />• Workshop will be held at a location that meets Covid-19 social distancing requirements. <br />0 Facilities or areas to be surveyed are readily accessible. <br />The 3D model could have some obscured areas especially from the inside's scans due of <br />obstructions and led area to set up the scanner at the crossing bridges on top of the <br />tank. <br />ExidUSiODS <br />The following items are excluded from this scope of work: <br />• Design or permit docurnents, <br />• Destructive inspection. <br />• Material testing or sampling,. <br />• Inspections of enclosed areas, <br />0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.