Laserfiche WebLink
Notes: <br />• Prices are in accordance with the IRCDUS 2020 Labor RFP 2020039 Valid Until 07/07/22. <br />• Sheeting will be needed in all (4) four areas (2 work zone and 2 line stop areas) in order to maintain the existing curbing and roadway on both <br />sides of the median. <br />• Section A and B has material pricing only. Hourly rate for the entire job has been reflected in Section D. <br />ACCEPTED: <br />The above prices, specifications and conditions are satisfactory and <br />are hereby accepted. <br />Buyer: <br />Signature: <br />Date of Acceptance: <br />3/22/20214:44:10 PM <br />[d61�IJC.7Z14DT <br />CK Contractors & Development Florida <br />Authorized Signature: y16✓, ` LAI <br />Estimator: <br />189Page 2 of 2 <br />