My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-082D
CBCC
>
Official Documents
>
2020's
>
2021
>
2021-082D
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2021 10:39:54 AM
Creation date
6/15/2021 11:16:06 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Amendment
Approved Date
06/08/2021
Control Number
2021-082D
Agenda Item Number
8.R.
Entity Name
CDM Smith
Subject
Amendment 2 to Work Order No. 5 for Groundwater Modeling & Impact Evaluation Permit No. 10524
moved from Consent Agenda to Utility Services prior to the meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Simulation 8 (SIMS) — Existing North County and South County wellfield wells will be pumping at <br />their current permitted allocation of 12.84 mgd. The requested additional allocation of 10.34 <br />mgd will be evenly split between the two proposed APPZ wellfields, one located near the North <br />County Wellfield and the other located near the South County Wellfield. The combined <br />withdrawals from the existing and proposed wellfields will be 23.18 mgd. Other existing legal <br />user wells within the model domain pumping at their current EOP withdrawal rate, except for <br />the agricultural use wells whose EOP allocations will be adjusted to 5 in 10 -year factors provided <br />by SJ RW M D. <br />Simulation 9 (SIM9) - Existing North County and South County wellfield wells will be pumped at a <br />combined pumping rate that affects the smallest number of other existing legal users. This <br />pumping rate will be obtained by an iterative process of increasing the pumping rate from 12.84 <br />mgd until arriving at a pumping rate that produces impacts to the smallest number of other <br />existing legal users. Other existing legal user wells within the model domain pumping at their <br />current EOP withdrawal rate, except for the agricultural use wells whose EOP allocations will be <br />adjusted to 5 and 10 -year factors provided by SJRWMD. <br />Simulations 7, 8, and 9 will be used by the CONSULTANT and OWNER in determining the groundwater <br />level drawdown due to the total proposed OWNER EOP withdrawal occurring from each wellfield. The <br />deliverable for this task will be maps showing the cone of depression (groundwater level drawdown) for <br />each wellfield pumping scenario and contours of cumulative groundwater level drawdown due to <br />pumping. The results of these simulations are for OWNER internal purposes only and will not be <br />submitted to SJRWMD in the groundwater modeling and impact evaluation. <br />TASK 2 - PROJECT AND QUALITY MANAGEMENT <br />Activities performed under this task consist of those general functions required to maintain the project <br />on schedule, within budget, and that the quality of the work products defined within this Work Order is <br />consistent with CONSULTANT's standards and the OWNER's requirements. Specific activities included <br />are identified below: <br />Subtask 2.1- Project Quality Management <br />CONSULTANT maintains a Quality Management System (QMS) on all projects. In accordance with the <br />QMS, a project planning and scope review meeting will be conducted at the start of the project. In <br />addition, the CONSULTANT's Technical Specialists will perform a quality review of the maps identified in <br />Task 1. <br />Subtask 2.2 - Project Status Reports <br />CONSULTANT's project manager will prepare and submit monthly written status reports with each <br />invoice for an anticipated project duration of 1 month. <br />OTHER SERVICES NOT INCLUDED IN THIS WORK ORDER <br />This Work Order does not include the following items; <br />• Identifying potential wellfield or well locations in the western part of Indian River County; <br />• Identifying potential wellfield or well locations near the South County and North County <br />Wellfields for the proposed APPZ wellfields; and <br />Smith Page 3 of 6 j13005_Exhlbits.doa <br />
The URL can be used to link to this page
Your browser does not support the video tag.