Laserfiche WebLink
SCOPE OF SERVICES <br /> Task 1—Wellfield Expansion and New Wellfield Evaluation <br /> Consultant will evaluate potential expansion of existing Hobart and Oslo UFA <br /> wellfield(s)to include new UFA wells,wellheads,piping, and pumping stations as <br /> required as long as this expansion does not impact ELU's. Consultant will evaluate <br /> feasibility of a third UFA wellfield for the Hobart WTP and/or expansion of the existing <br /> Oslo WTP wellfield. Consultant will also evaluate the need to potentially site a <br /> third/western wellfield and potential separate third WTP if that is the only option for use <br /> from an ELU standpoint if the wellfield expansion or deepening at the existing WTP's is <br /> not feasible. Consultant will prepare conceptual costs and timelines for this option if <br /> needed to be included in the evaluation matrix. <br /> Consultant will evaluate potential well sites and raw water supply based on the following: <br /> • IRC owned land <br /> • ELU impacts <br /> • Potential large landowners and developments <br /> • Accessibility for drilling, formation water disposal <br /> • Power supply availability <br /> • Setback requirements (sanitary, surface waters, contaminants) <br /> • Raw watermain routing& looping potential <br /> • Conceptual sizing of well, well pumps, electrical <br /> Consultant will prepare GIS maps that delineate countywide ELUs, respective capacities, <br /> and aquifer from which water is withdrawn. The GIS data will be queried to delineate <br /> type and capacity of each use, and potential impact from IRCU wells in the vicinity of the <br /> ELU's. The GIS information will also be used to overlay existing IRC owned land, <br /> zoning maps,rights-of-ways, and setbacks for new wells(i.e.,contaminated sites, <br /> sanitary setbacks,etc.). It is assumed that IRCU staff can provide some of this GIS <br /> information. <br /> Consultant will prepare conceptual costs for new wells,wellheads and pumps,raw <br /> watermain,booster pumping stations. Site costs will not be included,but if IRC owned <br /> sites are selected,they will be assumed to be negligible. <br /> Consultant will prepare a map of proposed wellsites, and conceptual piping arrangement <br /> and alignment to supply raw water to both Hobart WTP and Oslo WTP. Multiple maps <br /> may be used to depict multiple layers of information. Up to six(6)different map types <br /> may be provided in both electronic and hard copy format(24 x 36 size). <br /> Task 2—Test Well Evaluation of LFA and APPZ @ Oslo and Hobart <br /> Consultant will investigate the potential use of the Avon Park Permeable Zone (APPZ) <br /> which his part of the lower Upper Floridan Aquifer(UFA),and the Lower Floridan <br /> F:\Utilities\UTILITY-Engineering\WATER\CUP-10524\Admin\KHA\2021.5.1-FINAL AWS Eval Scope fh <br /> MDM_vb.docx <br /> Page 2 of 11 <br />