My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-082E
CBCC
>
Official Documents
>
2020's
>
2021
>
2021-082E
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2021 10:41:30 AM
Creation date
6/15/2021 11:35:34 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
06/08/2021
Control Number
2021-082E
Agenda Item Number
8.S.
Entity Name
Kimley-Horn & Associates, Inc
Subject
Work Order No. 5 for Wellfield and Alternative Water Supply Evaluation RFQ2019070
moved from Consent Agenda to Utility Services prior to the meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Aquifer,part of the boulder zone (>10,000 mg/L TDS) as an alternative water supply to <br /> supplement the existing UFA via test well evaluation. This task is intended to confirm <br /> which of the assumptions made regarding impacts to water quality is most likely to occur. <br /> This work will consist of drilling pilot hole through the existing borehole and logging <br /> water quality and yield data. <br /> Test well evaluation will provide the following information: <br /> • Determine confinement between APPZ, LFA and UFA <br /> • Define source water quality(and Quantity?) <br /> • Understand differences in yield/production between UFA, LFA, and APPZ <br /> • Define potential leakance between both UFA,LFA, and APPZ <br /> Consultant will prepare documents for test well deepening of existing wells N-7(Hobart) <br /> and S-1 (Oslo) and provide coordination with potential well drillers to conduct the work. <br /> Consultant will assist IRC purchasing department to solicit price proposals to perform the <br /> work. Consultant will respond to reasonable number of questions from prospective <br /> bidders. <br /> Consultant, along with subconsultant JLA Geosciences, Inc.will review price <br /> proposals/bids from contractors and prepare bid review letter. <br /> Consultant will review schedule prepared by the Contractor,provide coordination with <br /> IRCU operations and subconsultant, JLA Geosciences, and provide oversight of the well <br /> deepening procedures and activities. <br /> Consultant will provide hydrogeological support and observation services during Upper <br /> Floridan Aquifer well deepening, including pilot hole drilling and reaming, geophysical <br /> logging,completion interval drilling and associated testing,preliminary well <br /> development, acid treatment,pumdevelopment and testing, ost rehabilitation <br /> development testing and specific capacity testing. <br /> Consultant will also provide well performance testing, including water level <br /> measurements, specific capacity analysis,and basic water quality testing(conductivity, <br /> chlorides, silt density indices—SDI's and sand testing). Consultant will provide up to 140 <br /> hours of on-site hydrogeological services(JLA)for well deepening. <br /> Consultant will review data and prepare supporting information and technical evaluation <br /> into merits of deepening the wells,consisting of the following: <br /> • Reverse Air Drilling and field testing for 2 UFA Wells <br /> • Geophysical logging and video for 2 wells. <br /> • Pump Testing AAPZ/LFA? <br /> • Pumping test UFA(data partially available from North County APT testing— <br /> Task 6) <br /> • Data review and recommendation for rehabilitation including backfill depth, acid <br /> F:\Utilities\UTILITY-Engineering\WATER\CUP-10524\Admin\KHA\2021.5.1-FINAL AWS Eval Scope fh <br /> MDM vb.docx <br /> Page 3 01'11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.