My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-082C
CBCC
>
Official Documents
>
2020's
>
2021
>
2021-082C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2021 11:27:25 AM
Creation date
6/17/2021 11:25:55 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
06/08/2021
Control Number
2021-082C
Agenda Item Number
8.Q.
Entity Name
Schulke, Bittle and Stoddard, LLC
Subject
Work Order No. 2, Floravon Shores Septic to Sewer Design Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT `1' <br />SCOPE OF WORK <br />WORK ORDER NO.2 <br />Project Description <br />The proposed project will provide surveying, engineering design and permitting for the construction <br />of a new 8" Gravity Sewer Collection system within Floravon Shores subdivision. The facilities shall <br />provide sewage collection infrastructure to serve the existing home sites and platted lots, and provide <br />stub -outs for future connections and extensions to serve adjacent properties. The gravity sewer main <br />will be constructed from the east end (cul-de-sac) of 110' Street, and run west approximately 7861f to <br />the east side of the intersection of 110'1i Street and US 1; then the main shall run north along the east <br />right-of-way of US 1 approximately 3691f, where it will then turn east for 51 If, and connect to an <br />existing Indian River County Department of Utility services Sewage Lift station, where the sewage <br />collected will be pumped to the Indian River County Department of Utility services wastewater <br />treatment Plant. <br />The construction will provide existing utility customers that currently only are provided with water <br />service, the ability to connect to the IRC regional wastewater collection and treatment system; and the <br />connection of existing customers to the system will provide opportunities for existing residences to <br />abandon existing septic systems, which shall benefit the environment and water quality enjoyed by all <br />Indian River county residents. <br />Scope of Services <br />Schulke, Bittle & Stoddard, L.L.C. will provide services including surveying, engineering design, <br />preparation of construction plans, preparation and submittal of permit applications, preparation of <br />contract / bid documents, construction administration and periodic construction field inspection for the <br />construction of the new 8" Gravity Sewer Collection system within Floravon Shores subdivision. (see <br />Attachment "A" for location and Attachment `B" for construction cost tabulation). <br />The estimated cost for this project is $434,068.68 ($389,318.68 for construction and $44,750.00 for <br />engineer). <br />In connection with this project, the County will provide the Engineer with a copy of any pertinent <br />Preliminary Data or Reports; all available drawings in electronic AutoCADD format; all surveys, <br />maps and other documentation in the possession of or reasonably available to the County that are <br />pertinent to the project. <br />Services not included in this scope of services are listed as follows: <br />• Excavation for field verification of actual locations of existing underground utilities <br />and structures. It is requested that Indian River County provide the excavation as <br />directed by Schulke, Bittle & Stoddard, L.L.C. <br />• Any services associated with assisting Indian River County in review and evaluation <br />of patent related disputes, issues, or claims including preparing to serve or serving as <br />a consultant or witness for Indian River County in litigation, arbitration, public or <br />private hearings, or other legal administrative proceedings involving patent related <br />disputes, issues or claims. <br />• Any services in connection with the project not otherwise provided for in this scope <br />of services. <br />In order to execute this project in the most cost effective manner with the most aggressive schedule, <br />Schulke, Bittle & Stoddard, L.L.C. is retaining Houston, Schulke, Bittle & Stoddard, Inc. to prepare a <br />route survey necessary for the design and construction of the project, and will retain KSM <br />Engineering and Testing, Inc., for the geotechnical evaluation of the soils within the project. <br />
The URL can be used to link to this page
Your browser does not support the video tag.