My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-082C
CBCC
>
Official Documents
>
2020's
>
2021
>
2021-082C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2021 11:27:25 AM
Creation date
6/17/2021 11:25:55 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
06/08/2021
Control Number
2021-082C
Agenda Item Number
8.Q.
Entity Name
Schulke, Bittle and Stoddard, LLC
Subject
Work Order No. 2, Floravon Shores Septic to Sewer Design Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT `2' <br />FEESCHEDULE <br />WORK ORDER NO.2 <br />Method and Amount of Compensation <br />Schulke, Bittle & Stoddard, L.L.C., proposes to provide the above Scope of Services based on the <br />following lump sum <br />fees: <br />1. Surveying: route survey of 110' St and US 1, to include the establishment of a <br />baseline of survey and baseline of construction, location of all existing pavement, <br />utilities and other improvements, and establishment of survey horizontal <br />and vertical control. <br />$4,250.00 <br />2. Geotechnical Evaluation: Soil borings - six borings (3 in C.L. pavement <br />and 3 outside pavement). Cost includes ROW permit required to complete <br />borings. <br />$3,000.00 <br />3. Preliminary Engineering: Consultant coordination; field investigation, <br />documentation review, system (lift station capacity) evaluation, base plan <br />preparation. <br />$6,500.00 <br />4. Engineering design, preparation of Construction Plans & <br />Specifications, preparation and submittal of permit <br />Applications. Preparation of bid documents. Assistance during <br />Bidding, bid evaluation, contract award. <br />$15,000.00 <br />5. Construction Administration (Pre -con, shop review, pay requests, <br />change orders, minor plan modifications, Periodic Construction/Field <br />Inspections, As -Built review, final documentation for close-out and <br />final certifications.) <br />$13,500.00 <br />6. Reimbursables: Reimbursement for payment of direct costs, including <br />Reproduction and application fees. (See below for actual costs) <br />$2,500.00 estimate <br />Total: <br />$44,750.00 <br />Printing and Reproduction <br />The County shall make direct payment to our office for the cost of printing project plan sheets required <br />for utility <br />coordination and for copies of reports, drawings, specifications, and other pertinent items required by federal, state and <br />local agencies from whom approval of the project must be obtained, material suppliers, and other interested parties, but <br />may charge only for the actual cost of providing such copies based on the following tabulation: <br />8 1/2" x 11" $ 0.12/sheet Blue Line Prints <br />$ 0.333/SF <br />11" x 17" $ 0.50/sheet Reproducible Sepias <br />$ 0.75/SF <br />31/2" diskette $ 2.00/each Reproducible Mylars <br />$ 1.00/SF <br />CD $ 4.00/each <br />Application Fees <br />The county shall make direct payment to our office for the actual cost of all construction permit application fees paid to <br />jurisdictional agencies, including but not limited to: <br />• IRC ROW —N/A (IRCDUS does not pay IRC ROW application fees) <br />• FDEP Sewer - $250 <br />• MOT Utility — N/A <br />• FDEP NOI - $400 <br />
The URL can be used to link to this page
Your browser does not support the video tag.