My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05/04/2021
CBCC
>
Meetings
>
2020's
>
2021
>
05/04/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/24/2021 10:38:26 AM
Creation date
6/24/2021 10:07:57 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
05/04/2021
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
230
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Lakes at Waterway Village Plat Pod M,N,O,P <br />FINAL LIFT BOND - OPG <br />4/26/2021 <br />TOTALS 1 $ 269,908.00 <br />PROPOSED BOND AMOUNT (125%) j 262,385.00 <br />K(rn ! -'n'6r' ,% soci 511 6 <br />ny.,�P.` <br />torn <br />The Engineer has no control over the cost of labor, materials, equipment, or over the Contractor's methods of determining prices or over competitive <br />bidding or market. conditions. Opinions of probable costs provided herein are based on the information kno inn to Engineer atthi3 time and represent only <br />the Engineer's judgment as a design professional familiar with the construction industry. The Engineer cannot and does not guarantee that praposats, bids, <br />or actual construction costs will,notvary from its opinions of probable costs. <br />EXHIBIT "A" <br />ACt z Z 1 <br />Ift5Ufffft11t- <br />179 <br />PAVING <br />DESCRIPTION <br />QUANTITY <br />UNIT <br />UNIT COST <br />TOTAL <br />V ASPHALT (FINAL COURSE)- Pods M,N,O,P <br />18,600 Sy <br />$ 9.78 <br />$ <br />181,908.00 <br />SIGNING AND STRIPING <br />1 LS <br />$ 8,000.00 <br />$ <br />8,000.00 <br />SET PRM'S, PCP S1 LOT CORNERS <br />1 LS <br />$ 20,000.00 <br />$ <br />2C 000.00 <br />TOTAL - <br />- <br />$ <br />209.908:00 <br />TOTALS 1 $ 269,908.00 <br />PROPOSED BOND AMOUNT (125%) j 262,385.00 <br />K(rn ! -'n'6r' ,% soci 511 6 <br />ny.,�P.` <br />torn <br />The Engineer has no control over the cost of labor, materials, equipment, or over the Contractor's methods of determining prices or over competitive <br />bidding or market. conditions. Opinions of probable costs provided herein are based on the information kno inn to Engineer atthi3 time and represent only <br />the Engineer's judgment as a design professional familiar with the construction industry. The Engineer cannot and does not guarantee that praposats, bids, <br />or actual construction costs will,notvary from its opinions of probable costs. <br />EXHIBIT "A" <br />ACt z Z 1 <br />Ift5Ufffft11t- <br />179 <br />
The URL can be used to link to this page
Your browser does not support the video tag.