My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-078C
CBCC
>
Official Documents
>
2020's
>
2021
>
2021-078C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2021 5:47:40 PM
Creation date
7/2/2021 4:29:44 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
05/18/2021
Control Number
2021-078C
Agenda Item Number
15.B.1.
Entity Name
Geosyntec Consultants, Inc.
Subject
CCNA2018 Work Order 12 for one year of Groundwater Monitoring/Reporting
& Related Consulting Services at the former South Gifford Road Landfill
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Himanshu H. Mehta, P.E. <br />27 April 2021 <br />Page 5 <br />Ge®syntec d <br />consultants <br />will include database management, screening results against applicable regulatory criteria, and <br />summary data table preparation. This report is due to FDEP by 31 July 2021. <br />The winter 2021 report will be consistent with the groundwater monitoring reports historically <br />submitted to FDEP for this Site and the data evaluation activities will include database management, <br />screening results against applicable regulatory criteria, GIS figure preparation, time trend analyses, <br />and/or statistical data analyses. The winter 2021 annual report will be supported by attachments <br />containing Chain -of -Custody sheets, field notes and observations, water sampling logs, maps, graphs, <br />analytical results, quantitative statistical evaluation,. and other applicable materials. As part of the <br />statistical analysis, trend analysis graphs showing temporal concentrations of constituents and a <br />summary of the Mann -Kendall statistics will be included to identify increasing, decreasing, or no trends <br />in groundwater constituent concentrations. Historical data summaries will be included for monitoring <br />wells recommended for removal from the monitoring'plan. <br />The draft summer and winter 2021 reports will be submitted to IRC SWDD for review prior to submittal <br />to FDEP. Each final report will be signed and sealed, by a Florida registered professional engineer or <br />geologist. <br />SCHEDULE <br />The semi-annual groundwater sampling events will be tentatively conducted in June and December <br />2021 as described herein. Reports will be submitted to FDEP to meet required deadlines. <br />BUDGET ESTIMATE <br />A budget estimate for the scope of work outlined in Tasks l through 5 of this proposal is summarized <br />in the following table, and a detailed budget estimate is provided as Attachment A. The budget estimate <br />presented in this proposal is based on Geosyntec's understanding of the project requirements, our <br />experience gained from executing similar tasks for SWDD since 2002 at the Site, and experience with <br />groundwater monitoring and reporting activities at similar facilities. Geosyntec will not exceed the <br />budget estimate without prior approval and written authorization from IRC SWDD. Due to reduction <br />in the number of monitoring wells in the FDEP-approved sampling plan, discontinuation of certain <br />laboratory analyses, and sampling only with PDBs versus traditional purging methods, the overall <br />professional service hours were reduced by 10%. <br />FR0766\XR21012 <br />engineers I scientists I innovators <br />
The URL can be used to link to this page
Your browser does not support the video tag.