Laserfiche WebLink
Mr. Himanshu H. Mehta, P.E. <br />27 April 2021 <br />Page 4 <br />Geosyntec D <br />Consultants <br />(tentatively scheduled for December) will include sampling of 42 monitoring wells (all using PDBs). <br />The winter 2021 field event is budgeted to include a total of two and one-half (2.5) days (with two <br />persons) for groundwater sampling activities and PDB deployment for the summer 2022 field event. <br />Consistent field documentation and field protocols will be utilized to develop reliable data to support <br />the natural attenuation evaluation for the groundwater :plume. The groundwater samples will be <br />analyzed in accordance with the sampling plan summarized in the 2020 Annual Groundwater <br />:Monitoring Report. Quality control samples are proposed to be collected at a rate of 5% of total samples <br />as required by the most recent FDEP SOPs. <br />Geosyntec will conduct a complete round of groundwater level measurements concurrent with each <br />semi-annual groundwater sampling event (budgeted for one day with two -person field team for each <br />event). Depth to groundwater measurements will be recorded to the nearest 0.01 -ft in each monitoring <br />well, including existing monitoring wells and applicable City of Vero Beach wells (assumed up to 95 <br />wells per event). Due to wet site conditions and difficult access to certain well clusters, costs for rental <br />-of a utility task vehicle are included for one day of groundwater level measurements and one day of <br />sampling per event (4 total days). <br />It is anticipated that purge water (investigation -derived waste [1DW]) will be containerized in 55 -gallon <br />polyethylene drums and temporarily staged on Site for characterization prior to removal and disposal. <br />Costs are included herein for purchase of one 55 -gallon :polyethylene drum and for one-half day of <br />drum disposal oversight for one person. <br />During the monitoring well inventory during the winter 2020 field event, Geosyntec personnel <br />observed damage to one monitoring well, GR-MW06C, and maintenance activities are necessary to <br />'replace one bollard and repair the above ground polyvinyl. chloride (PVC) well casing which needs to <br />be reattached to the aboveground portion of the well casing. Geosyntec will provide oversight for a <br />subcontractor to make the repairs. Costs are included for one day of oversite (with one person) and for <br />subcontractor costs. A Florida -licensed surveyor will survey the repaired monitoring well and <br />:monitoring well GR-MW37B, installed in 2017. <br />Overall, for field activities, budget has been included for seven and one-half field days for one person, <br />six field days for a second person, (i.e., 13.5 man days); mobilization time for field personnel, and <br />associated field expenses for sampling. <br />Task 5 — Data Evaluation and Semi -Annual Reporting: Under this task, Geosyntec will perform <br />data evaluation activities and reporting. The reporting includes preparation of one summer 2021 report <br />(simplified format) and one winter 2021 report for submittal to FDEP. <br />The summer 2021 report will be a letter report with attachments, including a monitoring well location <br />map and tables of the field and laboratory results. Data evaluation activities for the summer 2021 report <br />VR0766\XR2 1012 <br />engineers I scientists I innovators <br />