My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-085A
CBCC
>
Official Documents
>
2020's
>
2021
>
2021-085A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2021 5:03:42 PM
Creation date
7/2/2021 4:55:21 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
06/15/2021
Control Number
2021-085A
Agenda Item Number
8.D.
Entity Name
Florida Site Contracting
Subject
4th Street Culvert Replacement at 90th Avenue,
Project Number
IRC-2022
Bid Number
2021045
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
223
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IRC -2022 <br />SC -5.09 Acceptance of Bonds and Insurance; Option to Replace <br />SC -5.09 Delete GC-5.09(paragraph A)in its entirety. <br />SC -6.02 Labor; Working Hours <br />SC -6.02.6. Add the following paragraphs immediately after paragraph GC -6.02.8: <br />1. Regular working hours are defined as Monday through Friday, excluding Indian River <br />County Holidays, from 7 a.m. to 5 p.m. <br />2. Indian River County Holidays are: New Year's Day, Martin Luther King, Jr. Day, Good <br />Friday, Memorial Day, Independence Day, Labor Day, Veterans Day, Thanksgiving Day, <br />Friday after Thanksgiving, Christmas Eve and Christmas Day. Working on these days will <br />not be permitted without prior written permission and approval from the Construction <br />Coordination Manager.. <br />3. The CONTRACTOR shall receive no additional compensation for overtime work, i.e., work <br />in excess of eight hours in any one calendar day or 40 hours in any one calendar week, <br />even though such overtime work may be required under emergency conditions and may <br />be ordered by the ENGINEER in writing. <br />4. All costs of inspection and testing performed during overtime work by the CONTRACTOR, <br />which is allowed solely for the convenience of the CONTRACTOR, shall be borne by the <br />CONTRACTOR, and a credit given to the OWNER to deduct the costs of all such inspection <br />and testing from any payments otherwise due the CONTRACTOR. <br />S. All costs of OWNER's employees and costs of ENGINEER's Consultant resulting from <br />overtime work by the CONTRACTOR, which is allowed solely for the convenience of the <br />CONTRACTOR, shall be borne by the CONTRACTOR, and a credit given to OWNER to <br />deduct all such costs from any payments otherwise due the CONTRACTOR. <br />6. No work shall commence before 7 a.m. or continue after 5 p.m. except in case of <br />emergency upon specific permission of the ENGINEER. <br />SC -6.06 Concerning Subcontractors, Suppliers, and Others <br />SC -6.06.C. Add the following sentence at the end of paragraph GC-6.06.C.- <br />OWNER <br />C-6.06.C. <br />OWNER or ENGINEER may furnish to any such Subcontractor, Supplier, or other individual or entity, to <br />the extent practicable, information about amounts paid to CONTRACTOR on account of Work performed <br />for CONTRACTOR by a particular Subcontractor, Supplier, or other individual or entity. <br />SC -6.08 Permits <br />SC -6.08 Add the following paragraphs immediately after paragraph GC -6.08.A: <br />1. The OWNER has obtained the following permits (copies of these permits are contained in <br />Appendix A): <br />Indian River Farms Water Control District — Permit #21-07 <br />2. The CONTRACTOR shall obtain and pay for all other required permits and <br />licenses. The CONTRACTOR shall provide copies of the permits to the <br />OWNER and ENGINEER and shall comply with all conditions contained in <br />the permits at no extra cost to the OWNER. <br />Supplementary Conditions - 00800-7 <br />F:\Public Works\ENGINEERING DIVISION PROJECTS\2022 4th St Culvert Replacement at 90th Ave\1-Admin\Bids\Bid Documents\DIV 05 Conditions of the Contract - <br />20201118.docx — <br />
The URL can be used to link to this page
Your browser does not support the video tag.