My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-085A
CBCC
>
Official Documents
>
2020's
>
2021
>
2021-085A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2021 5:03:42 PM
Creation date
7/2/2021 4:55:21 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
06/15/2021
Control Number
2021-085A
Agenda Item Number
8.D.
Entity Name
Florida Site Contracting
Subject
4th Street Culvert Replacement at 90th Avenue,
Project Number
IRC-2022
Bid Number
2021045
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
223
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IRC -2022 <br />3. The CONTRACTOR shall be familiar with all permit requirements during <br />construction and shall be responsible for complying with these <br />requirements. The cost of this effort shall be included in the pay item in <br />which the work is most closely associated with. <br />SC -9.05 Authorized Variations in Work <br />SC -9.05.A. Delete the second sentence in paragraph GC -9.05.A in its entirety. <br />SC -11.01 Cost of the Work <br />SC -11.01.A.1. Delete paragraph GC -11.01.A.1 in its entirety, and insert the following sentences in its place: <br />1. CONTRACTOR will receive payment for actual costs of direct labor and burden (see SC - <br />2.06.13) for the additional or unforeseen work. Labor includes foremen actually engaged in <br />the work; and will not include project supervisory personnel nor necessary on-site clerical <br />staff, except when the additional or unforeseen work is a controlling work item and the <br />performance of such controlling work item actually extends completion of the project due <br />to no fault of the Contractor. Compensation for project supervisory personnel, but in no <br />case higher than a Project Manager's position, shall only be for the pro -rata time such <br />supervisory personnel spent on the contract. In no case shall an officer or director of the <br />Company, nor those persons who own more than 1% of the Company, be considered as <br />project supervisory personnel, direct labor or foremen hereunder. The expenses of <br />performing Work outside of regular working hours, on Saturday, Sunday, or legal holidays, <br />shall be included in the above to the extent authorized by OWNER. <br />SC -13.03 Test and Inspections <br />SC -13.03.6. Delete paragraph GC -13.03.8 in its entirety, and insert the following sentences in its place: <br />OWNER shall employ and pay for the services of an independent testing laboratory to perform all <br />initial inspections, tests, or approvals required by the Contract Documents except those <br />inspections, tests, or approvals listed immediately below. Subsequent inspections, tests, or <br />approvals required after initial failing inspections, tests, or approvals shall be paid for by the <br />CONTRACTOR by back charge to subsequent applications for payment. The CONTRACTOR shall <br />arrange, obtain, and pay for the following inspections, tests, or approvals: <br />inspections, tests, or approvals covered by paragraphs 13.03.0 and 13.03.D below; <br />costs incurred in connection with tests or inspections conducted pursuant to paragraph <br />13.04.6 shall be paid as provided in said paragraph 13.04.6; <br />tests otherwise specifically provided in the Contract Documents. <br />SC -13.05 OWNER May Stop the Work <br />SC -13.05.A. Delete paragraph GC -13.05.A in its entirety and insert the following paragraph in its place: <br />A. If the Work is defective, or CONTRACTOR fails to supply sufficient skilled workers or <br />suitable materials or equipment, or fails to comply with permit requirements, or fails to <br />comply with the technical specifications, or fails to perform the Work in such a way that <br />the completed Work will conform to the Contract Documents, OWNER may order CON- <br />TRACTOR to stop the Work, or any portion thereof, until the cause for such order has been <br />eliminated; however, this right of OWNER to stop the Work shall not give rise to any duty <br />Supplementary Conditions - 00800-8 <br />F:\PublicWorks\ENGINEERING DIVISION PROJECTS\2022 4th St Culvert Replacement at 90th Ave\1-Admin\Bids\Bid Documents\DIV 0 5 Conditions of the Contract - <br />20201118.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.