My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-085A
CBCC
>
Official Documents
>
2020's
>
2021
>
2021-085A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2021 5:03:42 PM
Creation date
7/2/2021 4:55:21 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
06/15/2021
Control Number
2021-085A
Agenda Item Number
8.D.
Entity Name
Florida Site Contracting
Subject
4th Street Culvert Replacement at 90th Avenue,
Project Number
IRC-2022
Bid Number
2021045
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
223
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Division 2 - Technical Provisions, IRC -2022 <br />B. Apply polyacrylamide in strict accordance with the polyacrylamide manufacturer/supplier's <br />recommendations and specifications. <br />C. REPAIR ALL EROSION DAMAGE — At no additional cost to the OWNER and regardless of the <br />state of completion of the Work, immediately clean all dirt and debris from all pipes and <br />drainage structures; and repair all flooding, washouts, and all other erosion damage to the <br />Work. This responsibility shall not end until Final Acceptance of the Work by the OWNER. <br />Included is damage caused by erosion of any kind (e.g. wind, waves, stormwater runoff, <br />hurricanes, etc.) including Acts of God. Restore all erosion damaged areas to design grades <br />and elevations. Also, refer to General Conditions 6.13.6. <br />Item of Payment <br />Payment for the work specified in this item shall be made under: <br />Bid Item No. 104-1— Prevention, Control & Abatement of Erosion & Water Pollution - Per Lump <br />Sum <br />Bid Item No. 104-2 — Dewatering — Per Lump Sum <br />[The remainder of this page was left blank intentionally] <br />Division 2 — Technical Provisions - 01025-11 <br />FAPublic Works\ENGINEERING DIVISION PROJECTS\2022 4th St Culvert Replacement at 90th Ave\1-Admin\13ids\I3id Documents\DIV 2 TECHNICAL PROVISIONS - <br />20201118.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.