Laserfiche WebLink
Division 2 - Technical Provisions, IRC -2022 <br />F. All Record/As-Built drawings shall be prepared in digital format (ACAD Civil 3D 2013) and <br />shall utilize the digital design drawings as prepared by the Project Engineer as a base for the <br />Record/As-Built drawings. It is the responsibility of the Surveyor to request these files from <br />the Contractor or Project Owner in order to produce the Record/As-Built drawing set. <br />G. ALL improvements proposed to be constructed as shown on the approved construction plans <br />shall be field measured upon completion and shown on the Record/As-Built survey. Any <br />improvements that appear in both plan and profile views shall show the Record/As-Built <br />information in both views. <br />H. The following items are required to be shown on all Indian River County project Record/As- <br />Built drawings submitted to the County: <br />DRAINAGE: <br />1. Right-of-way Swale/Drainage — All culvert inverts, elevations and station offsets; inlet <br />grate and bottom elevations; swale beginning and end bottom elevations; and highs <br />and lows along top of bank. Size of swale. <br />2. Pipe Culvert/PVC Sleeves — All inverts, pipe size, stations and offsets. <br />3. Outfalls — All pipe inverts, pipe size, elevations and station offsets, weir box elevations, <br />weir elevation, bleeder elevation and sizes. <br />4. Roadway/Off Site Drainage — All inverts, elevations and station offsets; manhole top <br />elevation; grate top elevations. <br />5. Retention Ponds — Provide perimeter elevations, grade breaks, depths and calculated <br />pond areas at control elevation and grade breaks above and below water surface. Show <br />as -built of typical cross section as shown on design plan. <br />ROADWAY: <br />1. Stations and offsets related to controlling baseline and elevations of all structures, side <br />street and major driveway radius returns (edge of pavement), bends and/or change in <br />direction of roadway alignment, minimum of 1000' intervals along roadway alignment. <br />2. Elevations along Profile Grade Line (PGL), of all edge of pavements on each side of Profile <br />Grade Line (PGL), at medians at the high/low and PVI points along Profile Grade Line <br />(PGL). <br />3. All final Elevations to be plotted on PGL AND Plan & Profile sheets as applicable. <br />4. Elevations of edge of pavement and flow line at curb inlets and on the adjacent edge of <br />pavement at curb inlets. <br />WATER, FORCE, AND RECLAIMED WATER MAINS: <br />1. Show size and type of material used to construct mains. <br />2. Show horizontal location and elevation of all tees, crosses, bends, terminal ends, <br />valves, fire hydrants, air release valves, and sampling points, etc., by distances from <br />known reference points. <br />3. Show location, size and type of material of all sleeves and casing pipes. <br />4. Elevation and horizontal location of all storm sewers, gravity sewers including <br />laterals, force mains, water mains, etc. which are crossed; including clearance <br />dimension at all conflicts or crossings. <br />Division 2 — Technical Provisions - 01025-22 <br />F:\Public Works\ENGINEERING DIVISION PROJECTS\2022 4th St Culvert Replacement at 90th Ave\1-Admin\Bids\Bid Documents\DIV 2 TECHNICAL PROVISIONS - <br />20201118.docx — <br />