Laserfiche WebLink
Division 2 - Technical Provisions, IRC -2022 <br />5. Top of pipe elevation and horizontal location of all water and force main stub -outs. <br />6. Horizontal location of all services at the property lines. <br />7. Horizontal and vertical location of pipe including size of all mains and ground <br />elevation shall be obtained at one -hundred (100) foot intervals. Contractor shall <br />place temporary PVC stand pipes (tell -tales) at each of the one -hundred (100) foot <br />intervals and at all fittings and conflicts/crossings to facilitate the record drawing <br />survey. The tell-tale pipes shall be constructed of 2 -inch PVC pipe, shall be placed <br />on the top of the pipes to be surveyed, and shall be removed by the Contractor after <br />completion of the field survey by the "As -Built" Professional Surveyor. <br />8. Location of fire lines. <br />9. Dedicated easement locations, identified by O.R. Book and Page Number. <br />GRAVITY SEWER: <br />1. Manholes: Elevation of top rim, bottom elevation and invert of each influent and <br />effluent line. <br />2. Show distance between manholes center -to -center and horizontal location by <br />baseline station and offset. <br />3. Show material size and type used to construct sewer mains. <br />4. Show length (center of manhole to end of stub) distances from known reference <br />points or baseline offsets, and elevation of stub -outs. <br />5. Show which services have twenty (20) foot length of DIP at water main crossings. <br />6. Show station and offset location of sanitary services at property line. Particular care <br />in dimensioning needed in special situations, i.e., cul-de-sacs and locations where <br />services are not perpendicular to wye. <br />7. Show invert elevation of sanitary service at property line. <br />8. Any and all necessary dedicated easement locations, identified by O.R. Book and Page <br />Number. <br />PUMP / LIFT STATION: <br />Record Drawings shall show elevations for the top and bottom and diameter of wet well <br />along with invert of effluent line. Record Drawings should also indicate the make, model <br />number, horsepower, impeller and condition point of pumps selected and installed, shape <br />of wet well, location of control panel, location of pump out connection, float level settings, <br />any deviation from the plans, and serial number(s) of the pump(s). <br />SURVEY CONTROL <br />1. Install/re-establish: It shall be the contractor's responsibility to hire a Professional <br />Surveyor and Mapper as defined per Chapter 472, Florida Statutes, to replace any <br />horizontal and vertical control shown on the engineering plans that was destroyed <br />during construction. <br />2. New roadway alignment control points (survey baseline or controlling line and all points <br />as indicated on the plans or control sheet) upon final roadway completion. Include all <br />Division 2 — Technical Provisions - 01025-23 <br />F:\Public Works\ENGINEERING DIVISION PROJECTS\2022 4th St Culvert Replacement at 90th Ave\1-Admin\Bids\Bid Documents\DIV 2 TECHNICAL PROVISIONS - <br />20201118.docx <br />