My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-085A
CBCC
>
Official Documents
>
2020's
>
2021
>
2021-085A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2021 5:03:42 PM
Creation date
7/2/2021 4:55:21 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
06/15/2021
Control Number
2021-085A
Agenda Item Number
8.D.
Entity Name
Florida Site Contracting
Subject
4th Street Culvert Replacement at 90th Avenue,
Project Number
IRC-2022
Bid Number
2021045
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
223
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Indian River County Purchasing Division <br />purchasing@ircgov.com <br />ADDENDUM -NO. 2 <br />Issue Date: May 6, 2021 <br />Project Name: 4th Street Culvert Replacement at 90th Avenue (IRC -2022) <br />Bid Number: 2021045 <br />Bid Opening Date: May 19, 2021 <br />This addendum is being released to provide minutes to the pre-bid meeting and answer questions <br />received. The information and documents contained in this'addendum are hereby incorporated in the <br />invitation to bid. This addendum must be acknowledged where indicated on the bid form, or the bid will <br />be declared non-responsive. <br />Note: To facilitate social distancing, public attendance at the bid opening at 2:00 p.m. on May 19, 2021 <br />will be via Zoom only. To participate: <br />https://ircgov.zoom.us/*/7837260776 <br />Or Telephone: <br />Dial: <br />USA 602 333 2017 <br />USA 8882045987 (US Toll Free) <br />Conference code: 153949 <br />Attachments: <br />Pre -Bid Minutes <br />Itemized Bid Schedule — Addendum 2 <br />Plans Cover Sheet — Addendum 2 <br />Plan Sheets 4, 5 and 7 —Addendum 2 <br />IRFWCD Clarification: <br />Per Indian River Farms Water Control District, the installation requirements for the sheet pile is as <br />follows: <br />Sheet pile will be required both north and south of the construction zone. <br />• A 12 -foot wide weir notch in the middle, based upon the centerline of the canal, of the sheet pile <br />shall be provided on the upstream and downstream ends with the notch no higher than 19.0 -feet <br />NGVD. <br />
The URL can be used to link to this page
Your browser does not support the video tag.