Laserfiche WebLink
Mr. Eric Flavell, PE, F -ASCE <br />Bowman Consulting Group <br />4450 W. Eau Gallie Blvd., Suite 232 <br />Melbourne, FL 32934 <br />*INFRASTRUCTURE <br />SOLUTION SERVICES <br />'7175 Murrell Road, Melbourne, FL 32940 <br />Phone: 321-622-4646 <br />Subject: Proposal to Provide Surveying Services <br />Project No. BCGO05 — Indian River County West Wabasso Septic to Sewer Phase 3C <br />Dear Mr. Flavell: <br />Infrastructure Solution Services (ISS) is pleased to provide this proposal for surveying services for the <br />Indian River County (IRC) West Wabasso Septic to Sewer Project Phase 3C (the "Project") in <br />Wabasso, Florida to Bowman Consulting Group (BCG). <br />SECTION I. BACKGROUND <br />After speaking with Mr. Eric Flavell (BCG) and reviewing the provided scope and limits, it is ISS's <br />understanding that the Project consists of a topographic route survey of approximately 2,500' of <br />residential (dirt) road, 1,200' of residential (paved) road, and 400' of a main road. The project will be <br />divided into two separate tasks. <br />Task 1 will include approximately 700' of 87th Street (dirt), 400' of 86th Street (dirt), and 1,400' of 63rd <br />Avenue (dirt). It will include the connection of 13± homes. The survey will be used to aid in the design <br />of a gravity sewer system that will flow to an existing sanitary lift station on 87th Street. It is ISS's <br />understanding that the project will include collecting all available property control on all property <br />frontage to help establish approximate lot lines (per IRC Property Appraiser information) to be utilized in <br />design of the gravity system and tying into the lift station. The survey will also include a detailed <br />location of the existing lift station with pipe sizes, invert, and bottom elevations. <br />Task 2 will include 1,200' of 61st Street (paved), 400' of 85th Street (SR 510), topo, and locations of a <br />100' X 100' section of parcel 39232 in the SW comer (per IRC Property Appraiser). It will include <br />connection to 14 homes. This survey will be supplemental to the survey previously done by IRC and will <br />not include collecting any property control along the route. <br />For both Tasks, The ISS team will coordinate the location of all accessible existing septic tanks and <br />cleanouts for the 27± homes that will be connected to the new systems. All finished floor elevations will <br />be established for said homes as accurately as possible for the purpose of calculating slope on gravity <br />laterals along with general grade of the lot. All house basic footprints and permanent features will be <br />collected and shown to aid in design of service connections. The location of underground utilities, that <br />are marked by others, will be collected within the project area. A high resolution, georeferenced drone <br />image will be provided as a background in the survey. �, <br />