My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-091
CBCC
>
Official Documents
>
2020's
>
2021
>
2021-091
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2021 9:12:44 AM
Creation date
7/6/2021 9:12:15 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Amendment
Approved Date
06/22/2021
Control Number
2021-091
Agenda Item Number
12.H.1.
Entity Name
Bowman Consulting Group, Ltd.
Subject
CCNA2018 Work Order 3, Amendment 1, West Wabasso Septic to Sewer Phase 3C
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bowman Consulting Group <br />Mr.. Eric Flavell, PE, F-ASCF. <br />May 24, 2021 <br />SECTION II. SCOPE OF SERVICES <br />TASK 1&2 - Topographic Survey <br />A. Using the nearest published horizontal and vertical control, ISS will establish a minimum of five (5) <br />site control points with NAD 1983 State Plane coordinate values and NAVD 88 vertical values for <br />the collection of data and to be used as site benchmarks. <br />B. (Task 1) Establish frontage property lines for from available property control collected and per <br />available legal descriptions from the IRC Property Appraiser. <br />C. Map all above ground existing conditions utilizing conventional survey and GPS real-time kinematic <br />(RTK) methods along the route. Collect any marked underground utilities. This scope assumes that <br />any underground utilities that need to be mapped will be identified by others prior to <br />commencement of the existing conditions survey. <br />D. Fly a predefined route in accordance with all FAA Part 107 regulations with a DJI Phantom 4 Pro <br />drone to obtain aerial images. Aerial images will be processed with photogrammetry software for <br />image only. <br />E. Draw the existing conditions utilizing AutoCAD Civil 3D in state plane coordinates. Plot the existing <br />conditions on a signed and sealed survey map. <br />SECTION III. SURCONSULTANTS <br />TBD for septic tank locations <br />SECTION IV. CLIENT`S RESPONSIBILITY <br />BCG will be responsible for providing the ISS project team the following items: <br />A. Access to the project site and upfront communication with homeowners. <br />B. Identification and marking of underground utilities. <br />SECTION V, 12ELIVERABLES <br />ISS will provide the following deliverables: <br />Task 1 & 2 - Existing Conditions Map: Three (3) copies of signed and sealed survey maps and one <br />(1) digital copy delivered on CD or USB drive. <br />SECTION VI. SCHEDULE <br />ISS will begin survey field work for each task within two (2) weeks of receiving the signed proposal from <br />BCG. Field work and drafting will be complete within five (5) weeks of commencement. Survey map <br />deliverables will be provided to BCG within five (5) days thereafter. <br />
The URL can be used to link to this page
Your browser does not support the video tag.