Laserfiche WebLink
Bowman Consulting Group <br />Mr.. Eric Flavell, PE, F-ASCF. <br />May 24, 2021 <br />SECTION II. SCOPE OF SERVICES <br />TASK 1&2 - Topographic Survey <br />A. Using the nearest published horizontal and vertical control, ISS will establish a minimum of five (5) <br />site control points with NAD 1983 State Plane coordinate values and NAVD 88 vertical values for <br />the collection of data and to be used as site benchmarks. <br />B. (Task 1) Establish frontage property lines for from available property control collected and per <br />available legal descriptions from the IRC Property Appraiser. <br />C. Map all above ground existing conditions utilizing conventional survey and GPS real-time kinematic <br />(RTK) methods along the route. Collect any marked underground utilities. This scope assumes that <br />any underground utilities that need to be mapped will be identified by others prior to <br />commencement of the existing conditions survey. <br />D. Fly a predefined route in accordance with all FAA Part 107 regulations with a DJI Phantom 4 Pro <br />drone to obtain aerial images. Aerial images will be processed with photogrammetry software for <br />image only. <br />E. Draw the existing conditions utilizing AutoCAD Civil 3D in state plane coordinates. Plot the existing <br />conditions on a signed and sealed survey map. <br />SECTION III. SURCONSULTANTS <br />TBD for septic tank locations <br />SECTION IV. CLIENT`S RESPONSIBILITY <br />BCG will be responsible for providing the ISS project team the following items: <br />A. Access to the project site and upfront communication with homeowners. <br />B. Identification and marking of underground utilities. <br />SECTION V, 12ELIVERABLES <br />ISS will provide the following deliverables: <br />Task 1 & 2 - Existing Conditions Map: Three (3) copies of signed and sealed survey maps and one <br />(1) digital copy delivered on CD or USB drive. <br />SECTION VI. SCHEDULE <br />ISS will begin survey field work for each task within two (2) weeks of receiving the signed proposal from <br />BCG. Field work and drafting will be complete within five (5) weeks of commencement. Survey map <br />deliverables will be provided to BCG within five (5) days thereafter. <br />