My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-082F
CBCC
>
Official Documents
>
2020's
>
2021
>
2021-082F
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/20/2021 10:05:43 AM
Creation date
7/19/2021 2:32:10 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
06/08/2021
Control Number
2021-082F
Agenda Item Number
8.V.
Entity Name
Atlantic Roofing II of Vero Beach, Inc.
Subject
Courthouse Roof Replacement
Project Number
IRC-1764
Bid Number
2021036
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
305
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IRC -1764 <br />SC -5.07 Waiver of Rights <br />SC -5.07 Delete GC -5.07 (paragraphs A, 8, and Q in its entirety. <br />SC -5.08 Receipt and Application of Insurance Proceeds <br />SC -5.08 Delete GC -5.08 (paragraphs A and 8) in its entirety. <br />SC -5.09 Acceptance of Bonds and Insurance; Option to Replace <br />SC -5.09 Delete GC-5.09(paragraph A)in its entirety. <br />SC -6.02 Labor; Working Hours <br />SC -6.02.8. Add the following paragraphs immediately after paragraph GC -6.02.8: <br />Regular working hours will be restricted to between 5 p.m. and 7 a.m. Monday through <br />Friday, and weekends as needed, Saturday 10 a.m. to 7 p.m. and Sunday 7 a.m. to 5 p.m. <br />1. excluding Indian River County Holidays. <br />2. Indian River County Holidays are: New Year's Day, Martin Luther King, Jr. Day, Good Friday, <br />Memorial Day, Independence Day, Labor Day, Veterans Day, Thanksgiving Day, Friday after <br />Thanksgiving, Christmas Eve and Christmas Day. Working on these days will not be <br />permitted without prior written permission and approval from the Construction <br />Coordination Manager. <br />3. The CONTRACTOR shall receive no additional compensation for overtime work, i.e., work in <br />excess of eight hours in any one calendar day or 40 hours in any one calendar week, even <br />though such overtime work may be required under emergency conditions and may be <br />ordered by the ENGINEER in writing. <br />4. All costs of inspection and testing performed during overtime work by the CONTRACTOR, <br />which is allowed solely for the convenience of the CONTRACTOR, shall be borne by the <br />CONTRACTOR, and a credit given to the OWNER to deduct the costs of all such inspection <br />and testing from any payments otherwise due the CONTRACTOR. <br />5. All costs of OWNER's employees and costs of ENGINEER's Consultant resulting from <br />overtime work by the CONTRACTOR, which is allowed solely for the convenience of the <br />CONTRACTOR, shall be borne by the CONTRACTOR, and a credit given to OWNER to deduct <br />all such costs from any payments otherwise due the CONTRACTOR. <br />6. No work shall commence before 5 p.m. on week days or before 10 a.m. on Saturdays except <br />in case of emergency upon specific permission of the ENGINEER. <br />SC -6.06 Concerning Subcontractors, Suppliers, and Others <br />SC -6.06.C. Add the following sentence at the end of paragraph GC -6.06.C. <br />OWNER or ENGINEER may furnish to any such Subcontractor, Supplier, or other individual or entity, to the <br />extent practicable, information about amounts paid to CONTRACTOR on account of Work performed for <br />CONTRACTOR by a particular Subcontractor, Supplier, or other individual or entity. <br />SC -6.08 Permits <br />SC -6.08 Add the following paragraphs immediately after paragraph GC -6.08.A: <br />1. The OWNER has obtained the following permits (copies of these permits are contained in <br />Appendix A): <br />Indian River County Buildina Department Re -Roof Permit #2021030954 <br />Supplementary Conditions - 00800-7 <br />FAPublic Works\ENGINEERING DIVISION PROJECTS\1764 IRC Courthouse Roof Replacement\1-Admin\Bids\Bid DocumentsWaster Bid Documents\DIV 0 5 Conditions of the <br />Contract - 20201002.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.