My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-082F
CBCC
>
Official Documents
>
2020's
>
2021
>
2021-082F
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/20/2021 10:05:43 AM
Creation date
7/19/2021 2:32:10 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
06/08/2021
Control Number
2021-082F
Agenda Item Number
8.V.
Entity Name
Atlantic Roofing II of Vero Beach, Inc.
Subject
Courthouse Roof Replacement
Project Number
IRC-1764
Bid Number
2021036
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
305
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IRC -1764 <br />2. The CONTRACTOR shall obtain and pay for all other required permits and <br />licenses. The CONTRACTOR shall provide copies of the permits to the <br />OWNER and ENGINEER and shall comply with all conditions contained in <br />the permits at no extra cost to the OWNER. <br />3. The CONTRACTOR shall be familiar with all permit requirements during <br />construction and shall be responsible for complying with these <br />requirements. The cost of this effort shall be included in the pay item in <br />which the work is most closely associated with. <br />SC -9.05 Authorized Variations in Work <br />SC -9.05.A. Delete the second sentence in paragraph GC -9.05.A in its entirety. <br />SC -11.01 Cost of the Work <br />SC -11.01.A.1. Delete paragraph GC -11.01.A.1 in its entirety, and insert the following sentences in its place: <br />CONTRACTOR will receive payment for actual costs of direct labor and burden (see SC -2.06.6) <br />for the additional or unforeseen work. Labor includes foremen actually engaged in the work; <br />and will not include project supervisory personnel nor necessary on-site clerical staff, except <br />when the additional or unforeseen work is a controlling work item and the performance of <br />such controlling work item actually extends completion of the project due to no fault of the <br />Contractor. Compensation for project supervisory personnel, but in no case higher than a <br />Project Manager's position, shall only be for the pro -rata time such supervisory personnel <br />spent on the contract. In no case shall an officer or director of the Company, nor those <br />persons who own more than 1% of the Company, be considered as project supervisory <br />personnel, direct labor or foremen hereunder. The expenses of performing Work outside of <br />regular working hours, on Saturday, Sunday, or legal holidays, shall be included in the above <br />to the extent authorized by OWNER. <br />SC -13.03 Test and Inspections <br />SC -13.03.6. Delete paragraph GC -13.03.8 in its entirety, and insert the following sentences in its place: <br />OWNER shall employ and pay for the services of an independent testing laboratory to perform all <br />initial inspections, tests, or approvals required by the Contract Documents except those inspections, <br />tests, or approvals listed immediately below. Subsequent inspections, tests, or approvals required <br />after initial failing inspections, tests, or approvals shall be paid for by the CONTRACTOR by back <br />charge to subsequent applications for payment. The CONTRACTOR shall arrange, obtain, and pay <br />for the following inspections, tests, or approvals: <br />1. inspections, tests, or approvals covered by paragraphs 13.03.0 and 13.03.D below; <br />2. costs incurred in connection with tests or inspections conducted pursuant to paragraph <br />13.04.13 shall be paid as provided in said paragraph 13.04.6; <br />3. tests otherwise specifically provided in the Contract Documents. <br />SC -13.05 OWNER May $top the Work <br />SC -13.05.A. Delete paragraph GC -13.05.A in its entirety and insert the following paragraph in its place: <br />Supplementary Conditions - 00800-8 <br />F:\PublicWorkskENGINEERING DIVISION PROJECTS\1764 IRC Courthouse Roof Replacement\1-Admin\Bids\Bid Documents\Master Bid Documents\DIV 0 5 Conditions of the <br />Contract - 20201002.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.