My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-082F
CBCC
>
Official Documents
>
2020's
>
2021
>
2021-082F
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/20/2021 10:05:43 AM
Creation date
7/19/2021 2:32:10 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
06/08/2021
Control Number
2021-082F
Agenda Item Number
8.V.
Entity Name
Atlantic Roofing II of Vero Beach, Inc.
Subject
Courthouse Roof Replacement
Project Number
IRC-1764
Bid Number
2021036
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
305
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IRC -1764 <br />A. If the Work is defective, or CONTRACTOR fails to supply sufficient skilled workers or suitable <br />materials or equipment, or fails to comply with permit requirements, or fails to comply with <br />the technical specifications, or fails to perform the Work in such a way that the completed <br />Work will conform to the Contract Documents, OWNER may order CONTRACTOR to stop the <br />Work, or any portion thereof, until the cause for such order has been eliminated; however, <br />this right of OWNER to stop the Work shall not give rise to any duty on the part of OWNER to <br />exercise this right for the benefit of CONTRACTOR, any Subcontractor, any Supplier, any other <br />individual or entity, or any surety for, or employee or agent of any of them. <br />SC -13.07 Correction Period <br />SC -13.07A. Delete the first sentence of paragraph GC -13.07.A in its entirety and insert the following sentence <br />in its place <br />A. if within one year after the date of Final Completion or such longer period of time as may be <br />prescribed by Laws or Regulations or by the terms of any applicable special guarantee <br />required by the Contract Documents or by any specific provision of the Contract Documents, <br />any Work is found to be defective, or if the repair of any damages to the land or areas made <br />available for CONTRACTOR's use by OWNER or permitted by Laws and Regulations as <br />contemplated in paragraph 6.11.A is found to be defective, CONTRACTOR shall promptly, <br />without cost to OWNER and in accordance with OWNER's written instructions: (i) repair such <br />defective land or areas, or (ii) correct such defective Work or, if the defective Work has been <br />rejected by OWNER, remove it from the Project and replace it with Work that is not defective, <br />and (iii) satisfactorily correct or repair or remove and replace any damage to other Work, to <br />the work of others or other land or areas resulting therefrom. <br />SC -13.07 B. Delete paragraph GC -13.07.8 in its entirety and insert the following sentence in its place <br />B. In special circumstances where a particular item of equipment is placed in continuous service <br />before Final Completion of all the Work, the correction period for that item may start to run <br />from an earlier date if so provided in the Specifications or by Written Amendment. <br />SC -14.02 Progress Payments <br />SC -14.02.6.5. Delete paragraph GC -14.02.8.5.d in its entirety and insert the following paragraph in its place: <br />d. ENGINEER has actual knowledge of the occurrence of any of the events enumerated in <br />paragraph 15.02.A; or <br />SC -14.02.6.5. Add the following sentences at the end of paragraph GC -14.02.8.5: <br />e. OWNER has been required to pay ENGINEER additional compensation because of <br />CONTRACTOR delays or rejection of defective Work; or <br />f. OWNER has been required to pay an independent testing laboratory for subsequent <br />inspections, tests, or approvals taken after initial failing inspections, tests, or approvals. <br />SC -14.02.C.1. Delete paragraph GC -14.02.C.1 in its entirety and insert the following <br />paragraph in its place: <br />C. Payment Becomes Due <br />Supplementary Conditions - 00800-9 <br />F1Public Works\ENGINEERING DIVISION PROJECTS\1764 IRC Courthouse Roof Rep1acement\1-Admin\Bids\Bid Documents\Master Bid Documents\DIV 0 —5—Conditions of the <br />Contract - 20201002.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.