My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-082F
CBCC
>
Official Documents
>
2020's
>
2021
>
2021-082F
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/20/2021 10:05:43 AM
Creation date
7/19/2021 2:32:10 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
06/08/2021
Control Number
2021-082F
Agenda Item Number
8.V.
Entity Name
Atlantic Roofing II of Vero Beach, Inc.
Subject
Courthouse Roof Replacement
Project Number
IRC-1764
Bid Number
2021036
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
305
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INDIAN RIVER COUNTY COURTHOUSE PAGE 1 <br />METAL ROOFING REPLACEMENT PROJECT SECTION 074110 <br />JANUARY 15, 2021 STANDING SEAM METAL ROOF PANELS <br />DIVISION 7 — THERMAL AND MOISTURE PROTECTION <br />SECTION 074110 - STANDING -SEAM METAL ROOF PANELS <br />PART 1 - GENERAL <br />A. Drawings and general provisions of the Contract, including General and <br />Supplementary Conditions and Division 01 Specification Sections, apply to this <br />Section. <br />1.2 SUMMARY <br />A. Section includes standing -seam metal roof panels. <br />1.3 PREINSTALLATION MEETINGS <br />A. Preinstallation Conference: Conduct conference at project site. <br />1. Meet with Owner, Architect, Owner's insurer if applicable, metal panel Installer, <br />metal panel manufacturer's representative, structural -support Installer, and <br />installers whose work interfaces with or affects metal panels, including installers <br />of roof accessories and roof -mounted equipment. <br />2. Review and finalize construction schedule and verify availability of materials, <br />Installer's personnel, equipment, and facilities needed to make progress and <br />avoid delays. <br />3. Review methods and procedures related to metal panel installation, including <br />manufacturer's written instructions. <br />4. Examine support conditions for compliance with requirements, including <br />alignment between and attachment to structural members. <br />5. Review structural loading limitations of deck, purlins, and rafters during and after <br />roofing. <br />6. Review flashings, special details, drainage, penetrations, equipment curbs, and <br />condition of other construction that affect metal panels. <br />7. Review governing regulations and requirements for insurance, certificates, and <br />tests and inspections if applicable. <br />8. Review temporary protection requirements for metal panel systems during and <br />after installation. <br />9. Review procedures for repair of metal panels damaged after installation. <br />10. Document proceedings, including corrective measures and actions required, and <br />furnish copy of record to each participant. <br />1.4 ACTION SUBMITTALS <br />A. Product Data: For each type of product. <br />
The URL can be used to link to this page
Your browser does not support the video tag.