Approved Date
07/13/2021
Control Number
2021-095
Agenda Item Number
8.F.
Entity Name
Hedrick Brothers Construction Co. Inc.
Subject
Change Order 3 for Interior Renovation
Building and Fire Departments
Bid Number
2020057
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
W:Al61:1QmOwli3041 <br />Indian River County <br />Admin Alterations to Building 'A' <br />IDask <br />Modefl <br />Task Name <br />Duration Start Finish rede<euors <br />New mb r �D canu ry �Fe m �Ma sh ra IMay �Jo a �l ly Au <br />�S p[e ber <br />7TOTAL <br />PROJECT DURATION <br />181 days Thu 12/10/20 Mon 8/30/21 <br />)y <NA> <br /><NA> <br />DISCONNECT POWER/ DATA TO MODULAR FURNITURE-HB/IRC(Data) <br />I, DISASSEMBLE EXISTING MODULAR FURNITURE AND PUT IN STORAGE BY OTHERS <br /><NA> <br /><NA> <br />2 <br />PHASE 1 ENABLING ACTIVITIES (NON -CONSTRUCTION) <br />3 days Thu 12/10/20 Mon 12/14/20 <br />3 M <br />FIELD VERIFY SIZE OF EXISTING MODULAR FURNITURE FOR - <br />FUTURE LOCATIONS <br />3days Thu 12/10/20 Mon 12/14/20 <br />4 <br />DISCONNECT POWER/ DATA TO MODULAR <br />FURNITURE-HB/IRC(Data) <br />1 day Thu 12/10/20 Thu 12/10/20 <br />5 <br />, DISASSEMBLE EXISTING MODULAR FURNITURE AND PUT IN - <br />STORAGEBYOTHER5 <br />3 days Thu 12/10/20 Mon 12/14/20 455 <br />6M. <br />TOTAL CONSTRUCTION SCHEDULE <br />179 days Mon 12/14/20 Mon 8/30/21 <br /><NA> <br />TEMP WALL/ PROTECTION <br />a7 TEMP FILTERS ON EXISTING REGISTERS <br />REMOVE ALL CEILING TILE <br />T SUPPORT EXISTING LIGHTS AND GRILLS <br />REMOVECEIUNGGRID/SOFFITS <br />CAP OFF ANY EXISTING UTILITIES NOT TO BE USED <br />DEMO FLOORS/CABINETS/ SALVAGE SS SINKS FOR OWNER <br />LAYOUT NEW WALLS/ SOFFITS <br />FRAME <br />- MEP ROUGH <br />WATERLIN FROM PHASE THREE TO PHASE ONE <br />ALL <br />DOOR F MES <br />PRIME AND ONE COAT <br />CEILING GRID <br />I AEP ABOVE CEILING/ EXISTING LIGHTS TO B_ <br />I STALL MILLWORK <br />DROP TILE <br />INSTALL FLOORING <br />DOORS AND HARDWARE <br />FINISH PAINT <br />L CO <br />SAVED FOR OWNER <br />7 1 <br />PHASE ONE <br />61 days Mon 12/14/20 Fri 3/12/21 <br />e v <br />TEMP WALL / PROTECTION <br />2 days Mon 12/14/20 Tue 12/15/20 3SS <br />9 <br />TEMP FILTERS ON EXISTING REGISTERS <br />1 day Mon 12/14/20 Man 12/14/20 85S <br />t0 <br />REMOVE ALL CEILING TILE <br />2days Mon 12/14/20 Tue 12/15/20 9SS <br />11 <br />SUPPORT EXISTING LIGHTS AND GRILLS <br />2 days Mon 12/14/20 Tue 12/15/20 1055 <br />12 <br />REMOVE CEILING GRID/SOFFITS <br />3days Wed 12/16/20 Fri 12/18/20 11 <br />13 <br />CAP OFF ANY EXISTING UTILITIES NOT TO BE USED <br />3 days Mon 12/14/20 Wed 12/16/20 8SS <br />14 ®4 <br />DEMO FLOORS/CABINETS/SALVAGE SS SINKS FOR OWNER <br />7days Thu 12/17/20 Tue 12/29/20 13 <br />15 <br />LAYOUT NEW WALLS/SOFFITS <br />Iday Wed 12/30/20 Wed 12/30/20 14 <br />16 4 <br />FRAME <br />3 days Wed 12/30/20 Man 1/4/21 1555 <br />17 <br />MEP ROUGH <br />5 days Thu 12/31/20 Thu 1/7/21 1655+1 day <br />18 <br />WATER LINE FROM PHASE THREE TOPHASE ONE "1 <br />day Tue 12/15/20 Tue 12/15/20 5 <br />19 <br />HTF DRYWALL <br />7 days Fri 1/8/21 Tue 1/19/21 17 <br />20 M <br />DOOR FRAMES <br />1 day Wed 1/20/21 Wed 1/20/21 19 <br />21 aC <br />PRIME AND ONE COAT <br />3 days Mon 2/8/21 Wed 2/10/21 19FS+13 days <br />22 -9 <br />CEILING GRID <br />10 days Thu 2/11/21 Wed 2/24/21 21 <br />23 <br />MEPABOVE CEILING / EXISTING LIGHTS TO BE SAVED FOR <br />OWNER <br />6 days Mon 2/15/21 Man 2/22/21 2255+2 days <br />24 <br />INSTALL MILLWORK <br />5 days Mon 2/15/21 Fri 2/19/21 2355 <br />25 -3 <br />DROP TILE <br />2 days Thu 2/25/21 Fri 2/26/21 23,22 <br />26 <br />INSTALL FLOORING <br />5 days Mon 3/1/21 Fri 3/5/21 25 <br />27 <br />DOORS AND HARDWARE <br />3 days Mon 3/8/21 Wed 3/10/21 26 <br />28 M. <br />FINISH PAINT <br />5 days Mon 3/8/21 Fri 3/12/21 27SS <br />29 M. <br />TCO <br />1 day Fri 3/12/21 Frl 3/12/21 28FS-1 day <br />D.. <br />etect IRC BUILDING &FIRE <br />Date: Man 52421 <br />Task Summery r1 Inacfrve Milertone O Dura.—nly Starr -only C External M11 -...O cmkal split .. ,.."..,, <br />SpIR ... , ........ Pr Jett Summary I---------1 Inattive Summary T 8 Manual Sammary 0.ollup Finish -only 7 Deatlline 8 Progress <br />Milertone InaRive Task C� Manual Task Manual5ummary L ------ -i External Tasks Critical Maneal Progress <br />Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.