Official Document Type
Change Order
Approved Date
07/13/2021
Control Number
2021-095
Agenda Item Number
8.F.
Entity Name
Hedrick Brothers Construction Co. Inc.
Subject
Change Order 3 for Interior Renovation
Building and Fire Departments
Bid Number
2020057
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REVISED 5.19.2021 <br />Indian River County <br />Admin Alterations to Building 'A' <br />ID askask <br />Mode <br />Name <br />Duration <br />Start <br />Finish <br />Predecessors <br />Nw mb r �D ce <br />anu ry �Fe m <br />IMa rh rJ ey <br />ry Au urt <br />�lu a �9146/116/18611=1 <br />PHASE 1 <br />O PHASE 1 <br />G MODULAR FURNITURE IN P2 & 4 OFFICES AND P <br />REGISTERS <br />TO REMAIN AT WORKSTATIONS 117 AND OF <br />ROOM 127 <br />AND GRILLS <br />E COAT <br />CEILING / EXISTING LIGHTS TO BE SAVED FOR OW <br />FLOORING <br />RS AND HARDWARE <br />PAINT <br /><NA> <br />ABI - INSTALL WORK STATIONS IN PH <br />pte ber <br />26 <br />IN STORAGE BY <br />ICES <br />IER <br />ISE 2 <br />30 PHASE 2 ENABLING ACTIVITIES 11 days Mon 3/15/21 Mon 3/29/21 <br /><NA> <br />ABI - INSTALL WORK STATIONS IN <br />® IT INSTALL <br />IRC - OWNER MOVE BACK I <br />ABI - DISASSEMBLE EXIS7IP <br />4N <br />EMP WALL / PROTECTION <br />TEMP FILTERS ON EXISTING <br />PROTECT MODULAR FURNLRE <br />1 PROTECT EXISTING CONFERENCE <br />EMOVE ALL CEILING TILS <br />UPPORT EXISTING LIGHT'S <br />B REMOVE CEIl1NG GRIDI�I <br />DEMO FLOORS /CABINIETS <br />LAYOUT NEW WALLS <br />FRAME <br />MEP ROUGH <br />14TF DRYWALL <br />1 DOORFRAMES <br />PRIME AND OF <br />- CEILING GRI <br />MEP ABOVE <br />31 INSTALL MULLWORK <br />DROP THE <br />INSTALL <br />DOC <br />F <br />1 CO <br />31 ABI -INSTALL WORK STATIONS IN PHASE 1 2 days Mon 3/15/21 Tue 3/16/21 28 <br />32 IT INSTALL 8 days Tue 3/16/21 Thu 3/25/21 31FS-1 day <br />33 IRC - OWNER MOVE BACK INTO PHASE 1 8 days Tue 3/16/21 Thu 3/25/21 31FS-1 day <br />34 ABI - DISASSEMBLE EXISTING. MODULAR. FURNITURE IN P2 & 4 2 days Fri 3/26/21 Mon 3/29/21 33 <br />OFFICES AND PUT IN STORAGE BYOTHERS <br />35 PHASE TWO 32days Mon3/29/21 Wed 5/12/21 <br />36 TEMP WALL / PROTECTION 1 day Mon 3/29/21 Mon 3/29/21 34FS-1 day <br />37 TEMP FILTERS ON EXISTING REGISTERS 1 day Mon 3/29/21 Mon 3/29/21 3655 <br />38 PROTECT MODULAR FURNITURE TO REMAIN AT WORK 1 day Mon 3/29/21 Mon 3/29/21 36SS <br />STATIONS 117 AND OFFICES <br />39 PROTECT EXISTING CONFERENCE ROOM 127 1 day Tue 3/30/21 Tue 3/30/21 36 <br />40 REMOVE ALL CEILING TILE 3days Tue 3/30/21 Thu 4/1/21 37 <br />41 M. SUPPORT EXISTING LIGHTS AND GRILLS 3 days Tue 3/30/21 Thu 4/1/21 40SS <br />42 M REMOVE CEILING GRID 3 days Mon 4/5/21 Wed 4/7/21 41 <br />43 DEMO FLOORS/CABINETS 4days Mon 4/5/21 Thu 4/8/21 40 <br />ba LAYOUT NEW WALLS 3 days Wed 4/7/21 Fri 4/9/21 43SS+2 days <br />45 FRAME 3days Wed 4/7/21 Fri 4/9/21 44SS <br />46 MEP ROUGH 3 days Fri 4/9/21 Tue 4/13/21 45SS+2 days <br />47 HTF DRYWALL 4 days Wed 4/14/21 Mon 4/19/21 46 <br />48 DOORFRAMES 1day Tue 4/20/21 Tue 4/20/21 47 <br />49 PRIME AND ONE COAT 3 days Tue 4/20/21 Thu 4/22/21 47 <br />5D CEILING GRID 2 days Fri 4/23/21 Mon 4/26/21 49 <br />51 ® MEP ABOVE CEILING / EXISTING LIGHTS TO BE SAVED FOR 3 days Tue 4/27/21 Thu 4/29/21 50 <br />OWNER <br />52 INSTALL MILLWORK 3 days Tue 4/27/21 Thu 4/29/21 S15S <br />53 M DROP TILE 2 days Fri 4/30/21 Mon 5/3/21 51 <br />54 -R INSTALL FLOORING 4days Tue 5/4/21 Fri 5/7/21 53 <br />55 DOORS AND HARDWARE 3 days Man 5/10/21 Wed 5/12/21 54 <br />56 M. FINISH PAINT 3 days Mon 5/10/21 Wed 5/12/21 55SS <br />57 en TCO 1 day Wed 5/12/21 Wed 5/12/21 56FS-1 day <br />58 PHASE 3 ENABLING ACTIVITIES 28'days hu 5/13/21 Tue 6/22/21 <br />59 ABI - INSTALL WORK STATIONS IN PHASE 2 22 days u 5/13/21 Mon 6/14/21 56 <br />Project IRC BUILDING Be <br />Date on S/24/21 <br />Test sammery <br />Sput �........... ProjeR Summary 1'--1 <br />Milertone Inactive Task <br />^ metti.e Mneaone <br />Inattive Sammary <br />0 Manual Task <br />O D.mti—be sten-any [ <br />1 1 Manual Summary Rdlup Finish -only 7 <br />1 Manual Summery r ----1 Eattmal Tests <br />Fxtem.l Mnaseo�e O cmml splir .........,,, <br />Deadline b Progres <br />Cddml Manuel Progress <br />Page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.