REVISED 5.19.2021 <br />Indian River County <br />Admin Alterations to Building'A' <br />ID Task ask Name <br />Mode <br />60 IT INSTALL <br />Duration <br />6 days <br />Start <br />Mon 6/14/21 <br />Frush <br />Mon 6/21/21 <br />Predecessors <br />9FS-1 day <br />Nwemb r �D <br />e � aru ry �fe ru Me rA � r3 � ey <br />R INSTALL <br />RC- OWNER MOVE BACK INTO P <br />;.,ABI - DISASSEMBLE EXISTING MO <br />PROTECTION <br />ON EXISTING REG <br />CEILING TILE <br />ISTING LIGHTS AND <br />CEILING GRID / SOF <br />LOORS/CABINETS <br />NEW WALLS / SOFFl <br />E <br />P ROUGH <br />HTF DRYWALL <br />1 DOORFRAMES <br />PRIME AND ONE <br />CEILING GRID <br />IMEPABOVE <br />- MEP ABOVE <br />I DROP TILE <br />PORCEU <br />,>® INSTALL <br />INSTALI <br />INS <br />EXIST <br />S <br />STO I <br />CA AC ISS <br />LLD <br />ho FI <br />pte ber <br />E 2 and PHASE 1 <br />ULAR FURNITURE <br /><NA> <br />ERS <br />GRILLS <br />S <br />AT <br />FlLING/EXISTIN <br />INTI E <br />AILLWORK <br />FLOORING <br />LLWORKSTATIO <br />NG RECEPTION DE <br />CURITY GLASS O <br />FRONT PARTMO <br />RS AND HARDW <br />SH PAINT <br />TCO / CO <br />61 IRC -OWNER MOVE BACK INTO PHASE 2 and PHASE 1 6 days Mon 6/14/21 Mon 6/21/21 59FS-1 day <br />62 ABI -DISASSEMBLE EXISTING MODULAR FURNITURE IN P3 AND 2 days Mon 6/21/21 ue 6/22/21 61FS-1 day <br />PUT IN STORAGE BY OTHERS <br />63 PHASETHREE 49 days Tue 6/22/21 Mon 8/30/21 <br />64 TEMP WALL/ PROTECTION 1 day Tue 6/22/21 Tue 6/22/21 62FS-1 day <br />65 TEMP FILTERS ON EXISTING REGISTERS 1 day Tue 6/22/21 Tue 6/22/21 6455 <br />66 REMOVE ALL CEILING TILE 3days Wed 6/23/21 Fri 6/25/21 65 <br />67 SUPPORT EXISTING LIGHTS AND GRILLS 3 days Wed 6/23/21 Fri 6/25/21 6655 <br />68 REMOVE CEILING GRID /SOFFITS 3 days Mon 6/28/21 Wed 6/30/21 67 <br />69 DEMO FLOORS /CABINETS 5days Mon 6/28/21 Fri 7/2/21 685S <br />70 LAYOUT NEW WALLS/ SOFFITS 1 day u 7/1/21 Thu 7/1/21 69SS+3 days <br />71 FRAME 3 days Thu 7/1/21 Tue 7/6/21 7055 <br />72 MEP ROUGH 5 days Tue 7/6/21 Mon 7/12/21 7155+2 days <br />73 HTF DRYWALL 6 days Tue 7/13/21 Tue 7/20/21 72 <br />74 DOOR FRAMES 1 day Wed 7/21/21 Wed 7/21/21 73 <br />75 PRIMEANDONECOAT 3days Wed 7/21/21 Fri 7/23/21 73 <br />76 CEILING GRID 4 days Mon 7/26/21 Thu 7/29/21 75 <br />77 MEP ABOVECEILING/ EXISTING LIGHTS TO BE SAVED FOR 5days Wed 7/28/21 ue 8/3/21 7655+2 days <br />OWNER <br />78 DROP TILE 3days Wed 8/4/21 Fri 8/6/21 77 <br />79 PORCELAIN TILE 6days Wed 8/4/21 Wed 8/11/21 77 <br />80 INSTALL MILLWORK 5days Wed8/4/21 Tue8/10/21 7855 <br />81 INSTALL FLOORING 5 days Fri 8/6/21 Thu 8/12/21 785S+2 days <br />82 M. INSTALL WORK STATIONS BY OTHERS 3days Thu 8/12/21 Mon 8/16/21 79 <br />83 �IXISTING RECEPTION DESK INSTALL , 3 days Thu 8/12/21 Mon 8/16/21 79 <br />84 SECURITY GLASS ON TOP OF COUNTERS 12 days Tue 8/10/21 Wed 8/25/21 82FS-5 days <br />85 STORE FRONT PARTITION 5 days Tue 8/10/21 Mon 8/16/21 8455 <br />86 CARDACCESS 3days Wed 8/4/21 Fri 8/6/21 77 <br />87 M DOORS AND HARDWARE 3 days Tue 8/17/21 Thu 8/19/21 85 <br />88 FINISH PAINT 4 days Tue 8/17/21 Fri 8/20/21 85 <br />89 TCO / CO 3 days Thu 8/26/21 Mon 8/30/21 84 <br />Project IRC BUILDING & FIRE <br />Date; Mon 524/21 <br />reek svmmay <br />Split ............ Pmjea Summary <br />Mile— ♦ Inaclire Tesk <br />rr <br />r -----1 <br />Leake Miksnone <br />Inaarve Summary <br />0 Manuel Task <br />o W—I Mik.— O <br />L B Manual Summary Rdlup Finishonly 7 Deadline b <br />M.—I 5vmmary Cdpul <br />Crib., Spgt ............ <br />P.9— <br />Manual Progress <br />Page 3 <br />