Laserfiche WebLink
Original Schedule <br />Indian River County <br />Admin Alterations to Building 'A' <br />ID <br />Task <br />Mode [Task Name <br />ostar, Finish <br />rdecsorswemr <br />e a em <br />�J y Au <br />ld yA Gffik/136 7/4ry <br />ULAR FURNITURE-HB/IRC(Data) <br />RNITURE AND PUT IN STORAGE BY OTHERS <br />rt pte bar <br /><NA> <br /><NA> <br />1 <br />-TOTAL PROJECT DURATION <br />16Z days Thu 12/10/20 Tue 8/3/21 <br />h <NA> <br /><NA> <br />DISCONNECT POWER/ DATA TO MO <br />DISASSEMBLE EXISTING MODULAR <br />2 <br />PHASE 1 ENABUNG ACTIVITIES (NON -CONSTRUCTION) <br />3 days Th. 12/10/20 on <br />3 <br />n FIELD VERIFY SIZE OF EXISTING MODULAR FURNITURE FOR <br />FUTURE LOCATIONS <br />3days Thu 12/10/20 Mon 12/14/20 <br />4 <br />M DISCONNECT POWER /DATA TO MODULAR <br />FURNITURE-HB/IRC(Data) <br />Iday Thu 12/10/20 Thu 12/10/20 <br />5 <br />DISASSEMBLE EXISTING MODULAR FURNITURE AND PUT IN <br />STORAGE BY OTHERS <br />3 days Thu 12/10/20 Mon 12/14/20 <br />4SS <br />6 <br />M. TOTAL CONSTRUCTION SCHEDULE <br />160 days Mon 12/14/20 Tue 8/3/21 <br />r <br />I <br />- TEMP WALL/ PROTECTION <br />; TEMP FILTERS ON EXISTING REGIST <br />REMOVE ALL CEILING TILE <br />#7 SUPPORT EXISTING LIGHTS AND G <br />3 REMOVE CEILING GRID / SOFFITS <br />CAP OFF ANY EXISTING UTILITIES rIJOT <br />DEMO FLOORS/CABINETS <br />LAYOUT NEW WALLS/ SOF <br />FRAME <br />MEP ROUGH <br />WATERLIN FROMPHASETHREETOPHASEONE <br />ALL <br />k DOOR MES <br />PRIM <br />y 1 <br />1 <NA> <br />ITS <br />ILLS <br />TO BE USED <br />SALVAGE SS SINKS FOR OWNER <br />ITS <br />AND ONE COAT <br />CEILING GRID <br />I AEP ABOVE CEILING / EXISTING LIGHTS TO BE SAVED FOR OWNER <br />STALL MILLWORK <br />DROP TILE <br />INSTALL FLOORING <br />DOORS AND HARDWARE <br />FINISH PAINT <br />1 CO <br />7 <br />/1 PHASE ONE <br />61 days Mon 12/14/2D Fri 3/12/21 <br />8 <br />TEMP WALL / PROTECTION <br />2 days Mon 12/14/20 Tue 12/15/20 <br />3SS <br />9 <br />S TEMP FILTERS ON EXISTING REGISTERS <br />1 day Mon 12/14/20 Mon 12/14/20 <br />8SS <br />10 <br />REMOVE ALL CEILING TILE <br />2days Mon 12/14/20 Tue 12/15/20 <br />ISS <br />11 <br />SUPPORT EXISTING LIGHTS AND GRILLS <br />2 days Mon 12/14/20 Tue 12/15/20 <br />1055 <br />12 <br />®1 REMOVE CEILING GRID / SOFFITS <br />3 days Wed 12/16/20 Fri 12/18/20 <br />11 <br />13 <br />CAP OFF ANY EXISTING UTILITIES NOT TO BE USED <br />3 days Mon 12/14/20 Wed 12/16/20 <br />855 <br />14 <br />DEMO FLOORS/CABINETS/ SALVAGE SS SINKS FOR OWNER <br />7days Thu12/17/20 Tue 12/29/20 <br />13 <br />15 <br />LAYOUT NEW WALLS/ SOFFITS <br />Iday Wed 12/30/20 Wed 12/30/20 <br />14 <br />16 <br />1 FRAME <br />3 days Wed 12/30/20 Mon 1/4/21 <br />1555 <br />17 <br />MEP ROUGH <br />5 days u 12/31/20 Thu 1/7/21 <br />165S+1 day <br />18 <br />WATER LINE FROM PHASE THREE TO PHASE ONE <br />Iday Tue 12/15/20 Tue 12/15/20 <br />5 <br />19 <br />HTF DRYWALL <br />7 days Fri 1/8/21 Tue 1/19/21 <br />17 <br />20 <br />DOOR FRAMES <br />1 day Wed 1/20/21 Wed 1/20/21 <br />19 <br />21 <br />S PRIME AND ONE COAT <br />3 days Mon 2/8/21 Wed 2/10/21 <br />19FS+13 days <br />22 <br />CEILING GRID <br />10 days Thug/11/21 Wed 2/24/21 <br />21 <br />23 <br />R. MEP ABOVE CEILING / EXISTING LIGHTS TO BE SAVED FOR <br />OWNER <br />6 days Man 2/15/21 Mon 2/22/21 <br />2255+2 days <br />24 <br />INSTALL MILLWORK <br />5 days Mon 2/15/21 Fri 2/19/21 <br />2355 <br />25 <br />DROP TILE <br />2days Thu 2/25/21 Fri 2/26/21 <br />23,22 <br />26 <br />INSTALL FLOORING <br />5 days Mon 3/1/21 Fri 3/5/21 <br />25 <br />27 <br />-4 DOORS AND HARDWARE <br />3 days Mon 3/8/21 Wed 3/10/21 <br />26 <br />28 <br />FINISH PAINT <br />5 days Man 3/8/21 Fri 3/12/21 <br />2755 <br />29 <br />TCO <br />1 day Fri 3/12/21 Fri 3/12/21 <br />28FS-1 day <br />Pr jeaD IRC BUILDING & FIRE <br />Date: Wed 2/24/21 <br />Tast su,nmey ^ 1re m su, s e O ou..eiomony s ­ t, [ snemn Maenena O crrosnl ivgt .......... . <br />split ............ Pr Je[t Summary r -------- -1 Inactive Summary I 1 Manual Summary Rdlup Finishronly 3 Deadiae 8 P.9- <br />mi.- ♦ Inactive Tesk 0 Manuel Task Manuel Summery r ---------- I Frtemal Tasks Cdc.1 Manual Progress <br />Page 1 <br />