Original Schedule <br />Indian River County <br />Admin Alterations to Building 'A' <br />ID Task Task Name <br />Mode <br />Duration Start Finish Predecessors <br />NPvemb r ID cem er anu ry �h m �Ma dl IMay �Jo a �J IY Au n pte ber <br />30 PHASE 2 ENABLING ACTIVITIES <br />11 days Mon 3/15/21 Mon 3/29/21 <br />I �NA� <br />ABI - INSTALL WORK STATIONS IN PHASE 1 <br />® 1T INSTALL <br />OWNER MOVE BACK INTO PHASE 1 <br />ABI - DISASSEMBLE EXISTING MODULAR FURNITURE IN P2 & 4 <br />�NA� <br />EMP WALL/ PROTECTION <br />TEMP FILTERS ON EXISTING REGISTERS <br />T PROTECT MODULAR FURNITURE TO REMAIN AT WORK STATION <br />PROTECT EXISTING CONFERENCE ROOM 127 <br />EMOVE ALL CEILING TILE <br />UPPORT EXISTING LIGHTS AND GRILLS <br />B REMOVE CEILING GRID <br />DEMO FLOORS /CABINETS <br />LAYOUT NEW WALLS <br />FRAME <br />MEP ROUGH <br />HTF DRYWALL <br />t DOOR FRAMES <br />PRIME AND ONE COAT <br />CEILINGGRID <br />MEP ABOVE CEILING/ EXISTING LIGHTS TO BES <br />INSTALL MILLWORK <br />DROP TILE <br />INSTALL FLOORING <br />DOORS AND HARDWARE <br />FINISH PAINT <br />1 CO <br />�NA> <br />ABI - INSTALL WORK STATIONS IN PHA <br />FFICES AND PUT IN STORAGE BY <br />117 AND OFFICES <br />LVED FOR OWNER <br />2 <br />31 n ABI - INSTALL WORKSTATIONS IN PHASE 1 <br />2 days Mon 3/15/21 Tue 3/16/21 28 <br />32 an IT INSTALL <br />8 days Tue 3/16/21 Thu 3/25/21 31FS-1 day <br />33 M. IRC - OWNER MOVE BACK INTO PHASE 1 <br />8 days Tue 3/16/21 Thu 3/25/21 31FS-1 dayIRC- <br />34 ABI - DISASSEMBLE EXISTING MODULAR FURNITURE IN P2 & 4 <br />OFFICES AND PUT IN STORAGE BY OTHERS <br />2 days Fri 3/26/21 Mon 3/29/21 33 <br />35 PHASE TWO <br />32 days Mon 3/29/21 Wed 5/12/21 <br />36 TEMP WALL / PROTECTION <br />1 day Mon 3/29/21 Mon 3/29/21 34FS-1 day <br />37 TEMP FILTERS ON EXISTING REGISTERS <br />1 day Mon 3/29/21 Mon 3/29/21 3655 <br />38 M. PROTECT MODULAR FURNITURE TO REMAIN AT WORK <br />STATIONS 117 AND OFFICES <br />Iday Mon 3/29/21 Mon 3/29/21 3655 <br />39 3M PROTECT EXISTING CONFERENCE ROOM 127 <br />1 day Tue 3/30/21 Tue 3/30/21 36 <br />40 REMOVE ALL CEILING TILE <br />3 days Tue 3/30/21 Thu 4/1/21 37 <br />41 R. SUPPORT EXISTING LIGHTS AND GRILLS <br />3 days Tue 3/30/21 Thu 4/1/21 40SS <br />42 REMOVE CEILING GRID <br />3days Mon 4/5/21 Wed 4/7/21 41 <br />43 DEMO FLOORS /CABINETS <br />4 days Mon 4/5/21 Thu 4/8/21 40 <br />44 LAYOUT NEW WALLS <br />3 days Wed 4/7/21 Fri 4/9/21 4355+2 days <br />45 FRAME <br />3days Wed 4/7/21 Fri 4/9/21 44SS <br />46 MEP ROUGH <br />3 days Fri 4/9/21 Tue 4/13/21 4555+2 days <br />47 HTF DRYWALL <br />4 days Wed 4/14/21 Mon 4/19/21 46 <br />48 DOOR FRAMES <br />1 day Tue 4/20/21 Tue 4/20/21 47 <br />49 PRIME AND ONE COAT <br />3 days Tue 4/20/21 Thu 4/22/21 47 <br />so CEILING GRID <br />2days Fri 4/23/21 Mon 4/26/21 49 <br />51 MEP ABOVE CEILING/ EXISTING LIGHTS TO BE SAVED FOR <br />OWNER <br />3days Tue 4/27/21 Thu 4/29/21 50 <br />52 INSTALL MILLWORK <br />3days Tue 4/27/21 Thu 4/29/21 5155 <br />53 -% DROP TILE <br />2 days Fri 4/30/21 Mon 5/3/21 51 <br />54 INSTALL FLOORING <br />4 days Tue 5/4/21 Fri 5/7/21 53 <br />55 DOORS AND HARDWARE <br />3 days Mon 5/10/21 Wed 5/12/21 54 <br />56 M. FINISH PAINT <br />3 days Mon 5/10/21 Wed 5/12/21 5555 <br />57 TCO <br />1 day Wed 5/12/21 Wed 5/12/21 56FS-1 day <br />58 215 PHASE 3 ENABLING ACTIVITIES <br />19 days hhu 5/13/21 Tue 5/25/21 <br />59 ABI - INSTALL WORK STATIONS IN PHASE 2 <br />2 days Thu 5/13/21 Fri 5/14/21 56 <br />Project IRC BUILDING &FIRE <br />Date: Wed 2/24/21 <br />TeA Summery r1 In.6-Mi -- O Dur W -only Stag -only C &temal Milertone O C66.1 sort .. ... .. ..... <br />Z. Projen Sommary F'�1 InaRive Summary 1 1 Manual Summary Rollup Tinishonly 7 Deadline + P'.9— <br />mil—r. ♦ Inacdve Test Q Manual Task 1 Manuel Summary 1------1 Evlemal Tasks Cntiral Manual Progress <br />Page 2 <br />