Official Document Type
Change Order
Approved Date
07/13/2021
Control Number
2021-095
Agenda Item Number
8.F.
Entity Name
Hedrick Brothers Construction Co. Inc.
Subject
Change Order 3 for Interior Renovation
Building and Fire Departments
Bid Number
2020057
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Original Schedule <br />Indian River County <br />Admin Alterations to Building 'A' <br />ask Name <br />Duration <br />Start <br />Finish <br />Predecessors10 <br />n, r �D <br />1 11 <br />a awry �i< ma <br />�Me <br />rd ry flu a �J lyMode <br />IT INSTA <br />IRC- OWNER MOVE BACK INTO PH <br />ABI - DISASSEMBLE EXISTING MOD <br />EMP WALL/ PROTECTION <br />TEMP FILTERS ON EXISTING REGISI <br />EILING TILE <br />ING LIGHTS AND <br />ILING GRID /SOFF <br />ORS /CABINETS <br />W WALLS / SOFFI <br />OUGH <br />TF DRYWALL <br />OOR FRAMES <br />PRIME AND ONE <br />CEILING GRID <br />MEPABOVE <br />IMEPABOVE <br />DROP TI <br />PORCEU <br />INSTALL <br />INSTALI <br />1 INSTALL <br />yg EXIST <br />5 <br />STO <br />Y'CA D A <br />11 Dc C <br />yEp1 1 <br />E2 <br />JLAR FURNITURE IN P3 AND PU <br />�NA� <br />ERS <br />RILLS <br />S <br />AT <br />EKING/EXISTING LIGHTS TOB <br />JN TILE <br />MILLWORK <br />FLOORING <br />WORK STATIONS BY OTHER <br />NG RECEPTION DESK INSTALL <br />ECURITY GLASS ON TOP OF COU <br />FRONT PARTITION <br />FSS <br />RS AND HARDWARE <br />SH PAINT <br />TCO / CO <br />IT INSTALL 6 days Fri 5/14/21 Fri 5/21/21 59F5-1 day <br />r1Dask <br />IRC-OWNER MOVE BACK INTO PHASE 2 6 days Fri 5/14/21 Fri 5/21/21 59FS-1 day <br />ABI -DISASSEMBLE EXISTING MODULAR FURNITURE IN P3 AND 2 days Mon 5/24/21 Tue 5/25/21 61 <br />PUT IN STORAGE BY OTHERS <br />63 M. PHASE THREE 49 days Tue 5/25/21 Tue 8/3/21 <br />64 TEMP WALL/ PROTECTION 1 day Tue 5/25/21 Tue 5/25/21 62FS-1 day <br />65 TEMP FILTERS ON EXISTING REGISTERS I day Tue 5/25/21 Tue 5/25/21 6455 <br />66 REMOVE ALL CEILING TILE 3days Wed5/26/21 Fri 5/28/21 65 <br />67 SUPPORT EXISTING LIGHTS AND GRILLS 3 days Wed 5/26/21 Fri 5/28/21 6655 <br />68 REMOVE CEILING GRID/SOFFITS 3days Tue 6/1/21 Thu 6/3/21 67 <br />69 DEMO FLOORS/CABINETS 5 days Tue 6/1/21 Mon 6/7/21 6955 <br />70 LAYOUT NEW WALLS /SOFFITS 1 day Fri 6/4/21 Fri 6/4/21 69SS+3 days <br />71 FRAME 3 days Fri 6/4/21 ue 6/8/21 7055 <br />72 MEP ROUGH 5 days Tue 6/8/21 Mon 6/14/21 7155+2 days <br />73 HTF DRYWALL 6 days Tue 6/15/21 Tue 6/22/21 72 <br />74 DOOR FRAMES 1 day Wed 6/23/21 Wed 6/23/21 73 <br />75 PRIME AND ONE COAT 3days Wed 6123/21 Fri 6/25/21 73 <br />76 CEILING GRID 4 days Mon 6/28/21 u 7/1/21 75 <br />77 MEP ABOVE CEILING/ EXISTING LIGHTS TO BE SAVED FOR 5days Wed 6/30/21 Wed 7/7/21 7655+2 days <br />OWNER <br />78 DROP TILE 3 days Thu7/8/21 Mon 7/12/21 77 <br />79 PORCELAIN TILE 6 days Thu 7/8/21 Thu 7/15/21 77 <br />80 INSTALL MILLWORK 5 days Thu 7/8/21 Wed 7/14/21 7855 <br />81 INSTALL FLOORING 5 days Mon 7/12/21 Fri 7/16/21 7855+2 days <br />82 INSTALL 'WORKSTATIONS/ By OTHERS - 3days Fri 7/16/21 Tue 7/20/21 79 <br />83 M. EXISTING RECEPTION DESK INSTALL 3 days Fri 7/16/21 Tue 7/20/21 79 <br />84 M. SECURITY GLASS ON TOP OF COUNTERS 12 days Wed 7/14/21 Thu 7/29/21 82FS-S days <br />85 STORE FROM PARTITION 5 days Wed 7/14/21 Tue 7/20/21 8455 <br />86 CARD ACCESS 3 days Thu 7/8/21 Mon 7/12/21 77 <br />87 n DOORS AND HARDWARE - 3 days Wed 7/21/21 Fri 7/23/21 85 <br />88 FINISH PAINT 4 days Wed 7/21/21 Mon 7/26/21 85 <br />89 TCO / CO 3 days Fri 7/30/21 ue 8/3/21 84 <br />ProjeTask <br />Date: ed2/24LDING Bf FlRE <br />Date: Wed 2/24/21 <br />Summery <br />,,,,,, P.I.Summa <br />Spin � .. � . , ry <br />Milestone Inacdve Task <br />F-� <br />Iii <br />I-e6ve Milestone <br />Inactive Summary <br />0 Manuel Task <br />O Dunt —rly Sbrtronly C <br />I'�-'-0 Manuel Summary Rollu Finish -only 3 <br />p <br />ManualEatemel Tasks ® <br />E.temel Milertone O cn[-SPH .•.......... <br />Deadline + progress <br />"dotal Manuel Progress <br />Page 3 <br />