My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-098
CBCC
>
Official Documents
>
2020's
>
2021
>
2021-098
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2021 11:51:57 AM
Creation date
7/20/2021 12:52:07 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Amendment
Approved Date
07/13/2021
Control Number
2021-098
Agenda Item Number
8.M.
Entity Name
Carter Associates, Inc.
Subject
Jones Pier Conservation Area Public Use Improvements, Amendment 2 to Work Order 3
Continued Construction Administration Services
Engineering Services
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CARTER ASSOCIATES, INC. <br />CONSULTING ENGINEERS AND LAND SURVEYORS <br />1708 21st STREET • VERO BEACH, FLORIDA 32960.3472 • 772-562.419,1 •:772.562-7180 (FAX) <br />JOHN, H. BLUM; P.E.; PRINCIPAL <br />DAVID E. LUETHJE; P.S:M.,•PRINCIPAL <br />GEORGE -A: SIMONS, P.E:, PRINCIPAL <br />PATRICK S. WALTHER, P.E., PRINCIPAL <br />MARVIN E. CARTER; P:S.M., Consultant to the Fimt <br />DEAN F. LUETNJE, P.E., OLsno Consultant to the Fimt <br />June 22, 2021 <br />Ms. Elizabeth Powell <br />Assistant Director, Parks & Conservation Resources <br />Indian River County <br />5500 771h Street <br />Vero Beach, Florida 32967 <br />RE: Jones' Pier Conservation Area Project <br />Extended Construction Administration Services — Part 2 <br />CAI Project No. 18-39.8 E <br />Dear Beth: <br />FRANK S. CUCCURESE, P.S.ivf. <br />CLINTON J. RAHIES, P.E. <br />GEORGE ALEXANDER SIMONS, P.E: <br />TYLER N. SPENCER; P.E. <br />It is our pleasure to present for your acceptance, the following proposal for Civil Engineering <br />services associated with the above referenced project: ;Please find attached an ENGINEER's <br />scope of services and fee schedule. Additional services required, but not included in the <br />estimate, will be provided at our hourly rates, a copy of which is attached. <br />Thank you for giving us the opportunity to submit a proposal for our services. We look forward <br />to continuing to work with you on this project. Should you have any questions or need <br />additional information, please do not hesitate to contact me at our office. <br />Sincerely, <br />ASSOC TES, INC. <br />H. Blum, P.E. <br />N:IJHMPROPOSAWones Pier- Construction Administration2doc <br />©2021 by CAI <br />Page 1 of 3 S�elvin_ r PiGrida <br />—A Si Ince 1911 <br />
The URL can be used to link to this page
Your browser does not support the video tag.