My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-098
CBCC
>
Official Documents
>
2020's
>
2021
>
2021-098
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2021 11:51:57 AM
Creation date
7/20/2021 12:52:07 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Amendment
Approved Date
07/13/2021
Control Number
2021-098
Agenda Item Number
8.M.
Entity Name
Carter Associates, Inc.
Subject
Jones Pier Conservation Area Public Use Improvements, Amendment 2 to Work Order 3
Continued Construction Administration Services
Engineering Services
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROPOSAL TO PROVIDE <br />PROFESSIONAL ENGINEERING SERVICES <br />for <br />INDIAN RIVER COUNTY PARKS & CONSERVATION RESOURCES <br />JONES' PIER CONSERVATION AREA PROJECT <br />EXTENDED CONSTRUCTION ADMINISTRATION SERVICES <br />SECTION 1: SCOPE OF SERVICES <br />The following scope of services is based on a remaining- construction duration through <br />September 30, 2021. <br />• Attend weekly progress meetings for the remaining duration of construction (through September 30, <br />2021). <br />• Monitor construction progress and coordinate with 'contractor to provide schedule updates for <br />duration of construction. Provide schedule updates to Indian River County. <br />• Coordinate with other design consultants (MBV & ,Donadio) for required inspections or plan <br />clarifications. <br />• Respond to contractor Request for Information (RFI's) and provide construction clarifications as <br />needed. <br />• Review density tests and geotechnical reports. <br />• Consult with Indian River County for any change order requests. <br />• Review Pay Requests from the contractor and submit to the Indian River County following <br />approval. <br />• Conduct periodic construction observations/inspections to verify that the construction is proceeding <br />in accordance with the plans and specifications.. <br />• Conduct final inspection(s) and prepare punch list of work deficiencies. <br />• Review as -built survey (to be provided by contractor) for compliance with approved plans. <br />SECTION 2: ENGINEERING SCOPE ASSUMPTIONS: <br />In developing this Scope of Services, ENGINEER represents to the INDIAN RIVER COUNTY <br />that the following assumptions have been made and that deviation from these assumptions may <br />require additional work and compensation on behalf of INDIAN RIVER COUNTY to the <br />ENGINEER. <br />1. This proposal specifically excludes all application and/or impact fees, which shall be the <br />responsibility of INDIAN RIVER COUNTY. <br />2. Building inspections related to the restroom/pavilion or any other building structure is not <br />included and assumed to be the responsibility of the ARCHITECT. <br />3. Construction stakeout and as-builts are not included with this proposal. <br />SECTION 3: COMPENSATION <br />The proposed scope of services will be provided on a NOT TO EXCEED basis and invoiced <br />monthly based on work performed to date for each task. <br />Extended Construction Administration Services — Part 2 .......................................... $11,365.00. <br />NNH131PROPOSAWones Pier- Construction Administration2.doc Page 2 of 3 $Sciving Florida <br />02021 by CAI �Ajt Since 1911 <br />
The URL can be used to link to this page
Your browser does not support the video tag.