Laserfiche WebLink
Mr..Himanshu Mehta, P.E. Managing Director Geosyntecl:' <br />I July 2021 <br />Page 5 consultants <br />on laboratory analysis and waste acceptance rates. Geosyntec will use the EPA's Landfill Gas <br />Emissions Model Version 3.02 to estimate the NMOC emission rate. Results and conclusions <br />regarding the need for compliance with the NSPS monitoring and reporting requirements of the <br />Class I Landfill will be based on the regulatory threshold of 34 Mg/yr of NMOL emissions. A <br />copy of the NMOC Emission Rate Report will submitted to EPA via the Compliance and <br />Emissions Data Reporting Interface (CEDRI). <br />Phase 3 — Title V Permit Renewal Application <br />Geosyntec will prepare the FDEP Title V Air Operation Permit renewal application for the IRCL <br />facility. Geosyntec will complete FDEP, Division of Air Resource Management Form No. 62- <br />210.900(1) titled "Application for Air Permit - Long Form" and address the additional <br />information items required by the form. The following activities will be performed to prepare <br />the permit renewal application: <br />• Facility plot plan; <br />• Process flow diagram; <br />• Precautions to prevent emissions of unconfined particulate matter; <br />• List of insignificant activities; <br />• Identification of applicable requirements; <br />• Compliance report and plan <br />• Changes to current Title V Air Operation Permit; <br />• Fuel analysis or specification; <br />• Detailed description of control equipment; <br />• Procedures for startup and shutdown; <br />• Operation and maintenance plan; <br />• Previously submitted information; and <br />• Identification of applicable requirements <br />Geosyntec will describe the existing emission control system for IRCL facility, and calculate the <br />emissions of air pollutants anticipated to be released into the environment by its operation. <br />NCN2021-3236\11,21050 IRC `title V Air Permit Renewal Proposal <br />wigi11eers ( scientist's I innovators <br />