My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05/18/2021
CBCC
>
Meetings
>
2020's
>
2021
>
05/18/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/2/2021 10:57:54 AM
Creation date
8/2/2021 10:45:34 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
05/18/2021
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
327
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATKI NS <br />future, to track changes in structure, increase in size or occurrence in defects, and <br />identify areas requiring mitigation. Consultant will use survey of structure to <br />identify location of defects observed. <br />As part of evaluation, calculations will be performed to check the original .design <br />capacity using available information provided to Consultant bythe County and the <br />tank manufacturer in addition to the results of the survey. These calculations will <br />be used to formulate the technical memorandum outlined in Task 04 to determine <br />if the structure still has remaining useful life or if it is no longer safe for operation. <br />A brief summary of field notes and initial findings will be submitted to the client <br />at conclusion of Task 03. <br />Task.04 Technical Memorandum and Workshop <br />The Consultant shall prepare a preliminary technical memorandum (TM) <br />summarizing evaluations of the data collected and results of structural testing. <br />The TM will include up to three (3) options for mitigating or upgrading the existing <br />oxidation ditches and bridge structures, a comparison of the benefits and <br />challenges of implementing each option, and a rough order of magnitude <br />engineer's estimated cost for each option. <br />This preliminary TM will be provided electronically one week prior to being <br />presented in a Workshop format for IRC Staff. The Workshop will culminate in <br />discussions with attendees -that will result in a final recommendation for structural <br />improvements at the West WWTP oxidation ditches. A summary of the Workshop <br />discussions will be created and distributed to attendees within three (3) days of <br />the Presentation. <br />b. Final Evaluation and Recommendation TM <br />Following the Workshop, the TM will be updated to include review comments and <br />to include the final recommendation(s). One (1) electronic copy and four (4) draft <br />hard copies will be provided to IRC Staff. <br />Deliverables <br />Task <br />Deliverable <br />3 <br />Preliminary Field Notes and Findings <br />4 <br />Draft Structural Evaluation TM <br />4 <br />Final Structural Evaluation TM <br />Schedule <br />The anticipated schedule shown below is based on the weeks after the formal issuance of the <br />notice to proceed by the County: <br />115 <br />
The URL can be used to link to this page
Your browser does not support the video tag.