Laserfiche WebLink
ATKINS <br />Task <br />Duration from NTP <br />Project Kick -Off Meeting <br />2 weeks <br />Begin Survey Activities <br />4 weeks <br />Data Collection and Review <br />4 weeks <br />Structural Inspection and Evaluation <br />4 weeks <br />Draft Structural Evaluation TM <br />12 weeks <br />Workshop <br />14 weeks <br />Final Structural Evaluation TM <br />16 weeks <br />Quality Control <br />Consultant will be responsible for the professional quality of all deliverables. This shall include <br />an internal Quality Assurance Plan that, as a minimum, provides review of all deliverables and <br />significant calculations by another qualified professional that was not responsible for preparing <br />the deliverable or calculation. <br />Assumptions <br />The following assumptions have been made in the development of this scope of work, <br />schedule, and fee: <br />General <br />• The Record Drawings, calculations, and information on any upgrades for both oxidation <br />ditches are available and will be furnished to consultant. <br />• Attendees of the Workshop are designated as decision makers. <br />• Data requests will be addressed within.five (5) calendar days. <br />• Workshop will be held at a location that meets Covid-19 social distancing requirements. <br />• Facilities or areas to be surveyed are readily accessible. <br />• The 3D model could have some obscured areas especially from the inside's scans due of <br />obstructions and limited area to set up the scanner at the crossing bridges on top of the <br />tank. <br />Exclusions <br />The following items are excluded from this scope of work: <br />• Design or permit documents. <br />• Destructive inspection. <br />• Material testing or sampling. <br />• Inspections of enclosed areas. <br />116 <br />