My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05/18/2021
CBCC
>
Meetings
>
2020's
>
2021
>
05/18/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/2/2021 10:57:54 AM
Creation date
8/2/2021 10:45:34 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
05/18/2021
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
327
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10) ENVIRONMENTAL COMPONENTS: <br />a) How has the facility where the project is located demonstrated commitment to <br />environmental compliance, sustainability, and stewardship? The ELC hosts <br />thousands of visitors annually, and our vision is for them to experience and appreciate <br />the benefits of immersion in nature, understand the value of a healthy environment, be <br />inspired to create a more sustainable world and become stewards of the Indian River <br />Lagoon and the ICW, which is central to our area's economic, ecological and cultural <br />welfare, providing food, jobs, coastal protection and recreational opportunities. <br />b) What considerations, if any, have been made for sea level rise impacts in the design <br />and life span of this project? Project design complies with all State and Federal guidelines to <br />protect natural resources and address impacts of sea level rise to the extent feasible at this time. <br />The life span of the proposed project is anticipated to be at least 30 years. <br />(For reviewer only) <br />(1-3 points) <br />RATING POINT TOTAL <br />Note: <br />The total maximum score possible is dependent upon the project priority category but <br />cannot exceed 50 points unless the project qualifies as an emergency -related project. <br />The minimum score possible is 10 points. A score of 35 points or more is required to be <br />considered for funding. <br />Form No. 91-25A <br />Rule 66B-2.005 (Effective Date: 3-21-01, revised 4-24-06, 1-27-14) <br />40 <br />
The URL can be used to link to this page
Your browser does not support the video tag.