My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-100A
CBCC
>
Official Documents
>
2020's
>
2021
>
2021-100A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2021 3:33:01 PM
Creation date
8/16/2021 2:40:39 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
07/13/2021
Control Number
2021-100A
Agenda Item Number
15.B.1.
Entity Name
Indian River Sustainability Center, LLC
Indian River Eco District
Heartland Water Technology, Inc
Proximo Energy, LLC
Subject
Leachate Treatment Agreement
Solid Waste Disposal District
Area
1325 74th Avenue SW (the Landfill)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PART 2: DIVISION OF RESPONSIBILITIES <br />Division of Responsibilities <br />Scope of Work Description <br />Company <br />District <br />Concentrator & Flare, Hot Gas Transfer Equipment (HGTE} Design & Fabrication <br />X <br />Infeed Tank & Pum s <br />X <br />Processed Residual Tank(s) - Design & Supply <br />X <br />Concentrator & Flare, HGTE, Processed Residual Tanks} Transportation to Site, CIP per <br />Incoterms 2010 <br />X <br />Landfill Gas (LFG) and Nat Gas supply for thermal energy, [LFG Blower] and Controls (if <br />neededy Supply and Installation <br />(a) & (b) <br />X <br />Wastewater Storage Tank(s), Wastewater Supply Pump(s), Electrical & Utilities Connection <br />(a) & (c) <br />X <br />Infeed Wastewater <br />X <br />Chemical Storage Tanks <br />(a) <br />X <br />Site Works: Site Preparation (Earthworks, Foundations, Containment) <br />(b) <br />X <br />Containment Sump and Sump Pump <br />(b) <br />X <br />Prolect Management and Detailed Engineering <br />X <br />Concentrator System- Installation, Mechanical & Electrical Site Works <br />X <br />Crane/Manlift Rental for Equipment Unloading & Installation <br />X <br />Heat Trace & Insulation as needed <br />X <br />Other miscellaneous site M&E interconnecting materials <br />(e) <br />X <br />X <br />On-site Technical Advisory Support during equipment installation critical milestones <br />X <br />Remote monitoring and control system <br />X <br />Utility Supply LFG/ Nat Gas, Electricity, Service Water <br />(a) <br />X <br />Processed Residual Handling & Disposal <br />(b) <br />X <br />Permitting, Emissions Monitoring <br />X <br />Site Safety Equipment <br />X <br />Concentrator System Commissioning & Start-up . <br />I <br />X <br />Day-to-day Operation and Maintenance of Concentrator System, Including Consumables <br />(d) <br />X <br />Other Miscellaneous Items <br />(e) <br />X <br />X <br />(a) Major items include mainly: Processed Residual management and disposal, chemical storage tanks, utility supply. <br />(b) Company will provide the Residual Tank(s) as part of its scope of work.. Earthworks, foundation, secondary containment, containment sump and <br />sump pump, routing of Landfill Gas (LFG) and Nat Gas to Company flare. During operation, Developer will notify IRC SWDD when Residual Tank(s) <br />must be emptied, and IRC SWDD (via its on-site logistics partners will transport the Processed Residual to the top of landfill and dispose in landfill. <br />(c) The point of connection is the Concentrator skid; electrical includes 480VAC service. <br />(d) Developer plans to have 1-2 fully trained site engineers at site full-time. Consumables include antifoam, CIP, lubricant, etc. <br />(e) Such as site engineering services, permitting, Processed Residual disposal, construction tools, power & consumables, equipment rentals, etc. <br />Page 29 of 32 <br />
The URL can be used to link to this page
Your browser does not support the video tag.