Laserfiche WebLink
PART 2: DIVISION OF RESPONSIBILITIES <br />Division of Responsibilities <br />Scope of Work Description <br />Company <br />District <br />Concentrator & Flare, Hot Gas Transfer Equipment (HGTE} Design & Fabrication <br />X <br />Infeed Tank & Pum s <br />X <br />Processed Residual Tank(s) - Design & Supply <br />X <br />Concentrator & Flare, HGTE, Processed Residual Tanks} Transportation to Site, CIP per <br />Incoterms 2010 <br />X <br />Landfill Gas (LFG) and Nat Gas supply for thermal energy, [LFG Blower] and Controls (if <br />neededy Supply and Installation <br />(a) & (b) <br />X <br />Wastewater Storage Tank(s), Wastewater Supply Pump(s), Electrical & Utilities Connection <br />(a) & (c) <br />X <br />Infeed Wastewater <br />X <br />Chemical Storage Tanks <br />(a) <br />X <br />Site Works: Site Preparation (Earthworks, Foundations, Containment) <br />(b) <br />X <br />Containment Sump and Sump Pump <br />(b) <br />X <br />Prolect Management and Detailed Engineering <br />X <br />Concentrator System- Installation, Mechanical & Electrical Site Works <br />X <br />Crane/Manlift Rental for Equipment Unloading & Installation <br />X <br />Heat Trace & Insulation as needed <br />X <br />Other miscellaneous site M&E interconnecting materials <br />(e) <br />X <br />X <br />On-site Technical Advisory Support during equipment installation critical milestones <br />X <br />Remote monitoring and control system <br />X <br />Utility Supply LFG/ Nat Gas, Electricity, Service Water <br />(a) <br />X <br />Processed Residual Handling & Disposal <br />(b) <br />X <br />Permitting, Emissions Monitoring <br />X <br />Site Safety Equipment <br />X <br />Concentrator System Commissioning & Start-up . <br />I <br />X <br />Day-to-day Operation and Maintenance of Concentrator System, Including Consumables <br />(d) <br />X <br />Other Miscellaneous Items <br />(e) <br />X <br />X <br />(a) Major items include mainly: Processed Residual management and disposal, chemical storage tanks, utility supply. <br />(b) Company will provide the Residual Tank(s) as part of its scope of work.. Earthworks, foundation, secondary containment, containment sump and <br />sump pump, routing of Landfill Gas (LFG) and Nat Gas to Company flare. During operation, Developer will notify IRC SWDD when Residual Tank(s) <br />must be emptied, and IRC SWDD (via its on-site logistics partners will transport the Processed Residual to the top of landfill and dispose in landfill. <br />(c) The point of connection is the Concentrator skid; electrical includes 480VAC service. <br />(d) Developer plans to have 1-2 fully trained site engineers at site full-time. Consumables include antifoam, CIP, lubricant, etc. <br />(e) Such as site engineering services, permitting, Processed Residual disposal, construction tools, power & consumables, equipment rentals, etc. <br />Page 29 of 32 <br />